Laserfiche WebLink
CITY OF EVERETT <br /> 2010 To 2015 Six-year Transportation Improvement Program <br /> Interstate Local Access and Other Projects <br /> 1. I-5/Downtown Everett Interchange Access Improvements 1. BNSF RR safety improvements (Safety) <br /> (Everett Ave.Hewitt Ave.,US 2,Pacific Ave.) 2. Local roadway safety projects (Safety) <br /> 2. I-5 / 100th Street SE HOV Access/Undercrossing 3. Safe routes to schools (Safety) <br /> 3. NB Everett Mall Way/ SB I-5 Onramp <br /> 4. I-5 /Smith Island Interchange (12th St.or SR 529) 1. Annual Street Overlay Program (Maintenance) <br /> 5. I-5/East Marine View Drive Interchange Improvements 2. Sidewalk repair and replacement (Maintenance) <br /> 6. I-5 HOV Lanes(US 2 to SR 528) 3. Pavement marking projects (Maintenance) <br /> 7. I-5/ 128th Street Interchange <br /> 8. I-5/ 128th Street HOV Ramps(Mariner PNR) 1. 106th Place SE Improvements (Street) <br /> 9. I-5/ 112th Street Interchange Study 2. 3rd Avenue SE Improvements (Street) <br /> 3. Local Street Improvements(Pine,Fulton,etc.) (Street) <br /> Freeways 4. Upper&Lower Ridge Rd.Improvements (Street) <br /> 1. US 2 Improvements(I-5 to SR 204) 5. Simpson Site Access Improvements (Street) <br /> 2. SR 526/Hardeson Road Interchange 6. Downtown Streetscape Improvements (Street) <br /> 3. SR 526 Extension(1-5 to US 2) <br /> 4. SR 526/Evergreen Way Interchange 1. Traffic Signal Central Control Repl. (Traffic Signals) <br /> 5. SR 529/Smith Island Ramps 2. Traffic Signal Interconnect (Traffic Signals) <br /> 6. SR 526/40th Avenue W.Intersection Improvements 3. Traffic Signal Improvements (Traffic Signals) <br /> Principal Arterials 1. Neighborhood Block Grants (Neighborhoods) <br /> 1. W.Marine View Dr./Rucker/41st Freight Route Improvements 2. Neighborhood Traffic Studies/Proj. (Neighborhoods) <br /> 2. Broadway Bridge Replacement(Bridge#529/5a) 3. Residential Sidewalks (Neighborhoods) <br /> 3. Broadway Corridor Improvements(SR 529 to SR 526) <br /> 4. SR 99/Evergreen Way BRT Improvements. (128th to Pacific) 1. City Entryway Landscaping/Signs (Landscaping) <br /> 5. Arterial Safety Projects (Forest Park,I-5 and Pacific,etc.) <br /> 6. Pacific Avenue/BNSF Grade Crossing Improvements Non-Motorized Trail/Path Improvements <br /> 7. Evergreen Way Improvements(415t St.to Gipson Road) 1. Riverfront Walkway Phase II <br /> 8. I-5 to Port of Everett Truck Route 2. East Everett Pedestrian Walkway <br /> 9. Mukilteo Blvd.Safety Imp. (Friday Ave.to City Limits) 3. 7th Avenue SE Ped/Bike Improvements(92nd to 112th) <br /> 10. Arterial Needs Study 4. Henry M.Jackson Ped.Bridge <br /> 5. 36th St. (or vicinity)/BNSF Rail Line Ped/Bike Crossing <br /> Minor Arterials 6. Smith Island Bike and Pedestrian Improvements <br /> 1. 112th Street SW-SE Street Improvements (I-5 to SR 527) 7. Riverside Bus Pk.Ped.Trail(16th to N.Broadway) <br /> 2. 116th Street SE Street Improvements(SR 527 to 35th) 8. West/East Marine View Drive Bike-Ped Improvements <br /> 3. 100th Street SW Street Improv.(4th Ave.W.to Airport) 9. 47th Street Ped Improvements(Evergreen to Black Forest Lane) <br /> 4. Casino Rd.Safety Improvements(Evergreen to 5th Ave.) 10. Pigeon Creek No. 1/BNSF Rail Line Crossing <br /> 5. 4th Avenue West Improvements(104th to 112th) 11. Grand Avenue/North Marina Ped-Bike Connection <br /> 6. 100th Street SE Improvements(SR 527 to 7th Ave SE) 12. Shoreline Access Imp. (Various Locations) <br /> 7. 100th Street SE Improvements(7th Ave to Evergreen) 13. Snohomish River Bike/Pedestrian Bridge Evaluation <br /> 8. 110th Street SE Improvements (SR 527 to 35th St.) 14. Pigeon Creek Rd.No. 1 Improvements <br /> 9. Lenora St./Lowell-River Rd./BNSF Rail Line Oxing 15. Everett Non-motorized Projects(Various Locations in Everett) <br /> 10. Minor Arterial Streetscape Improvements 16. Lowell Snohomish River Road.Bike/Ped Connection <br /> 17. Riverfront District Bike/Ped Paths <br /> Collector Arterials 18. Interurban Trail Bike/Ped Path Improvements <br /> 1. East Everett Avenue/BNSF Overcrossing <br /> 2. Holly Dr.Non-motorized Imp. (4th Ave.W.to 92nd) Transit <br /> 3. Bond Street Ped/Bike Improvements. (Kromer to Terminal) 1. Bus Replacements-2010 to 2015 <br /> 4. Chestnut St. /Eclipse Mill Road.Improvements(Pacific to 36th) 2. Bus Fleet Expansion <br /> 5. Silver Lake Road-121st Street SE Ped.Improvements 3. Implementation of State CTR law <br /> 6. 36th St./Smith St.Ped,Bike,Landscape Improvements 4. Midtown Transit Center <br /> 7. 36th St./BNSF At-grade Rail Crossing Closure 5. Base Relocation <br /> 8. 37th Street Improvements (Rucker to Broadway) 6. Southeast Transit Center <br /> 9. Collector Arterial Streetscape Improvements 7. SWIFT Northern Terminal <br /> 8. Marysville Service <br /> 9. Transit Priority Equipment <br /> 10. Riverfront to Harborfront Connector <br /> 11. Smart Bus Technologies <br /> HOV Projects <br /> 1. Everett Station Park&Ride Parking Structure <br /> Projects in bold type not included in 2009-2014 TIP <br />