|
CITY OF EVERETT 2010 TO 2015 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PRIO- PE RAN CONST. Est 2010-15 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO
<br /> 1 Interstate 1 1-5 Downtown interchange improvements Pacific,Everett,Hewitt Ayes,and US 2 Jan 11 Jun 12 Sep 13 28500,000 • EVERETT 1
<br /> 2 Interstate 2 1-5/100th Street SE HOV Access/Undercrossing I-5 at 100th Street SE Jul.11 Jan.12 Jan.13 68,500,000 • EVERETT 2
<br /> 3 Interstate 3 NB Everett Mall Way to SB 1-5 Onramp Everett Mall Way to southbound 1-5 Jan.10 May 11 3,500,000 • WSDOT 3
<br /> 4 Interstate 4 1-5/Smith Island interchange 12th Ave.NE or SR 529 Jan.11 Jun 12 Jul.13 10,000,000 • EVERETT 4
<br /> 5 Interstate 5 1-5/East Marine View Dove Interchange 1-5 at East Marine View Drive Jan.12 Jun.13 Jun 14 16,000,000 • EVERETT 5
<br /> 6 Interstate 6 1-5 HOV Lanes US 2 to SR 528 Jan 13 Jun 17 May.19 5,000,000 • WSDOT 6
<br /> 7 Interstate 7 1-5/128th Street Interchange I-5 at 128th Street Jan.13 Jan.19 May 21 2,000,000 * WSDOT 7
<br /> 8 Interstate 8 1-5/128th Street HOV Ramps(Mariner PNR) 1-5 at 128th Street/Mariner PNR Jan.10 Jan 12 May 14 6,000,000 ' WSDOT 8
<br /> 9 Interstate 9 1-5/112th Street Interchange Study 1-5 at 112th Street SE Jan 14 3,000,000 • WSDOT 9
<br /> 10 Freeway 1 US 2 Improvements 1-5 to SR 204 Jun 13 Jun 15 Jun 16 3,000,000 • WSDOT 10
<br /> 11 Freeway 2 SR 526/Hardeson Road Interchange SR 526 at Hardeson Road Jun 13 Jun.15 Jun.17 2,000,000 * WSDOT 11
<br /> 12 Freeway 3 SR 526 Extension Study SR 526 to US 2 Jun 11 8,500,000 • WSDOT 12
<br /> 13 Freeway 4 SR 526/Evergreen Way Interchange SR 526 at Evergreen Way Jun 13 Jun 15 Jun 17 38,000,000 * WSDOT 13
<br /> 14 Freeway 5 SR 526/40th Avenue West Intersection SR 526 and 40th Avenue West Jun 13 Jun 15 Jun 16 500,000 • EVERETT 14
<br /> 15 Freeway 6 SR 529/Smith Island Ramps SR 529 at Smith Island Jun 13 Jun 15 Jun 17 250,000 * WSDOT 15
<br /> 16 Principal Arterial 1 W Marine View Dr/Rucker Ave/41st St Freight Route W Marine View Dr.,Rucker Ave,41st Street Sep 10 Sep 11 Jun 13 4,280,000 * EVERETT 16
<br /> 17 Principal Arterial 2 Broadway Bridge Replacement(#529I5a) Hewitt Ave.to California Ave. Mar.10 Jul.11 Mar.12 7,300,000 • EVERETT 17
<br /> 19 Principal Artenal 3 Broadway Corridor Improvements SR 526 to SR 529 Feb 10 Feb.11 Jun 12 4,000,000 • EVERETT 18
<br /> 20 Principal Arterial 4 SR 99/Evergreen Way Bus Rapid Transit Corridor 128th Street to Everett Station May 08 Jan 09 2,150,000 1 EVERETT 19
<br /> 21 Principal Arterial 5 Arterial Safety Projects(Forest Pk entrances,1-5 and Pacific) Various Locations Jan 10 Mar 11 900,000 • EVERETT
<br /> 22 Principal Arterial 6 Pacific Avenue/BNSF Grade Crossing Improvements Pacific Avenue and Chestnut St Jan 11 Jun 12 Jun 14 6,000,000 *1 EVERETT 20
<br /> 23 Principal Arterial 7 Evergreen Way Improvements,41st to Airport Road 41st to Airport Road Jan 11 Jul 12 1,000,000 •i EVERETT 21
<br /> 24 Principal Arterial 8 Interstate 5 to Port of Everett Truck Route Plan Port of Everett to 1-5 Jan 11 200,000 • EVERETT
<br /> 25 Principal Arterial 9 Mukilteo Blvd Safety Improvements Friday Avenue to city limits Feb 12 Apr 13 3,300,000 EVERETT 22
<br /> 26 Principal Arterial 10 Arterial Needs Study Various arterials within city limits Feb 10 200,000 • EVERETT
<br /> 28 Minor Artenal 1 112th Street SE Improvements Interstate 5 to 19th Avenue SE Jun 07 Apr.09 Jul 10 4,650,000 EVERETT 23
<br /> 29 Minor Arterial 2 116th Street SE Improvements SR 527 to 35th Street SE Jan.10 Jul 11 May 12 3.800,000 • EVERETT 24
<br /> 30 Minor Arterial 3 100th Street SW Improvements Airport Road to 4th Avenue West Feb 10 Jun 11 3,600,000 • EVERETT 25
<br /> 31 Minor Arterial 4 Casino Road at 5th Ave.W Road Intersection Improvements Casino Road at Hardeson Road Mar.11 Mar.12 May.13 500,000 • EVERETT 26
<br /> 32 Minor Artenal 5 4th Avenue West Widening and Improvement 104th Street to 112th St.SW Jan 11 Jan.12 May.13 9,000,000 • SNO CNTY 27
<br /> 34 Minor Arterial 6 100th Street SE Improvements SR 527 to 7th Avenue SE Jan.14 Jan.16 May 18 1,000,000 • EVERETT 28
<br /> 35 Minor Arterial 7 100th Street SE Improvements 7th Avenue SE to Evergreen Way Jan 14 Jan.16 May.18 1,000,000 • EVERETT 29
<br /> 36 Minor Arterial 8 110th Street SE Improvements SR 527 to 35th Street SE Jan 11 Jan.13 May.15 2,000,000 • EVERETT 30
<br /> 37 Minor Arterial 9 Lenora St./BNSF Rail Line Overcrossing Lenora St&Lowell Sno River Rd. Jul 11 Jul.13 May 15 1,800,000 • EVERETT 31
<br /> 38 Minor Arterial 10 Minor Arterial Expansions and Streetscaping Various Locations Jan 11_ Jan 13 May 15 400,000 • EVERETT
<br /> 39 Collector Arterial 1 East Everett Ave/BNSF Overcrossing East Grand Ave to Railway Ave. Jan 12 Sep 13 Jun 14 7,000,000 • EVERETT 32
<br /> 40 Collector Arterial 2 Holly Drive Non-Motorized Improvements 4th Avenue W to 92nd Street Jul 07 Oct.08 300,000 * EVERETT 33
<br /> 41 Collector Arterial 3 Bond Street Ped/Bike Improvements Kromer to Terminal Ave Jun 03 Jan.04 Jul 08 100,000 EVERETT 34
<br /> 42 Collector Arterial 4 Chestnut St/Eclipse Mill Rd Improvements Pacific Ave to 36th Street Jan.10 Jun.11 3,350,000 • EVERETT 35
<br /> 43 Collector Arterial 5 Silver Lake Road-121st St.SE Ped Improv 112th Street to SR 527 Jun 10 Jun.11 Jul 12 1,500,000 EVERETT 36
<br /> 44 Collector Arterial 6 36th Street/Smith Street Ped,Bike&Lndscp Improv Broadway to Eclipse Mill Rd,36th to 33rd Jan.10 May.11 May.12 1,000,000 • EVERETT 37
<br /> 45 Collector Arterial 7 36th Street/BNSF At-grade Rail Crossing Closure 36th St.&BNSF Rail Line Jan 09 Sep.09 Jun 10 200,000 EVERETT 38
<br /> 46 Collector Arterial 8 37th Street improvements and traffic signal Rucker Avenue to Wetmore Ave Jun 10 Jun.11 500,000 • EVERETT 39
<br /> 47 Collector Arterial 9 Collector Arterial Streetscape Improvements Various Locations Jun 10 Jun 11 Jul.12 400,000 • EVERETT
<br /> 266,180,000
<br /> *A portion or all of the funding for this project has not yet been committed.
<br /> NOTE Projects shown in bold type were not included in the 2009-2014 Six-Year TIP.
<br />
|