|
CITY OF EVERETT 2010 TO 2015 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PRIG- PE R/W CONST. Est 2010-15 LEAD MAP
<br /> Number TYPE RITY PROJECT NAME TERMINI START START START Expenditures AGENCY NO
<br /> 48 Local Access-SAF 1 BNSF RR safety improvements Various locations Jan 09 Jun 09 600,000 EVERETT
<br /> 49 Local Access-SAF 2 Local Roadway Safety Projects Various locations Jan 09 Jun.09 120,000 " EVERETT
<br /> 50 Local Access-SAF 3 Safe Routes to Schools Various locations Jan 09 Apr 10 600,000 " EVERETT
<br /> 51 Local Access-PRIM 1 Annual Street Overlay Program Various streets Jan 09 Jul09 6,000,000 EVERETT
<br /> 52 Local Access-PRIM 2 Sidewalk repair and replacement Various locations Jan.09 May 09 360,000 EVERETT
<br /> 53 Local Access-PR/M 3 Pavement Marking Project Various locations Jan 09 May 09 210.000 EVERETT
<br /> 54 Local Access-STR 1 106th Place SE Improvements 16th Avenue SE to 19th Avenue SE Nov 10 Jun 11 650,000 " EVERETT 40
<br /> 55 Local Access-STR 2 3rd Avenue SE Street Improvements 92nd Street SE to 95th Street SE Jan 11 Apr 12 675,000 • EVERETT 41
<br /> 56 Local Access-STR 3 Local Street Improvements Pine,Fulton,California Jul 11 May 12 580,000 * EVERETT
<br /> 57 Local Access-STR 4 Upper&Lower Ridge Rd Str Improv 74th Street to 78th Street Aug 12 Jun 13 300.000 " EVERETT 42
<br /> 58 Local Access-STR 5 Simpson Site Access Improvements Simpson Site,Snohomish Riverfront Aug 09 Jun 10 2,000,000" EVERETT 43
<br /> 59 Local Access-STR 6 Downtown Streetscape Improvements Various locations in the Central Business District Jul.09 Jan.10 Apr.10 8,000,000 * EVERETT 44
<br /> 60 Local Access-SIG 1 Traffic Signal Central Controller Replacement Various locations Jan.09 Jul.09 600,000 EVERETT
<br /> 61 Local Access-SIG 2 Traffic Signal Interconnect Various locations Jan 09 May 09 240,000 EVERETT
<br /> 62 Local Access-SIG 3 Traffic Signal Improvements Various locations Jan 09 Jun 09 900,000 EVERETT
<br /> 63 Local Access-NEI 1 Neighborhood Block Grants Various locations Jan 09 May 09 360,000 " EVERETT
<br /> 64 Local Access-NEI 2 Neighb Traffic Mitigation Studies&Projects Various locations Jan.09 May 09 2,400,000 " EVERETT
<br /> 65 Local Access-NEI 3 Residential Sidewalks Various locations Jan 09 May 09 2,400,000 " EVERETT
<br /> 66 Local Access-LS 1 City Entryway Landscaping and Signs Various entry corridors into the City Mar.09 Jul 09 180,000 " EVERETT
<br /> 67 Local Access-NM 1 Riverfront Walkway Phase II 41st Street to Smith Street May 08 May.09 55,000 EVERETT 45
<br /> 68 Local Access-NM 2 East Everett Pedestnan Walkway East Grand and 1-5 Jan 10 Jul 11 850,000 • EVERETT 46
<br /> 69 Local Access-NM 3 7th Avenue SE Ped/Bike Improvements 9nd Street SE to 112th Street SE Jun.07 Aug.08 100,000 EVERETT 47
<br /> 70 Local Access-NM 4 Henry Jackson Park Ped Bridge E Marine View Dnve to Riverside Bus Park Jan.07 May.10 Jul 11 2,700,000 • EVERETT 48
<br /> 71 Local Access-NM 5 36th Street/BNSF Rail Line Ped/Bike Crossing 36th&BNSF Rail Line Jan.08 Nov.08 Jun 10 2,800,000 " EVERETT 49
<br /> 72 Local Access-NM 6 Smith Island Bike/Ped improvements Various arterials on Smith Island Jan 10 Jan 11 May 12 1,000,000 " EVERETT 50
<br /> 73 Local Access-NM 7 Riverside Business Park Ped trail Snohomish River at Riverside Business Park Apr.09 Apr.10 700,000 " EVERETT 51
<br /> 74 Local Access-NM 8 West/East Marine View Dnve Bike-Ped Improvements Alverson Bridge to North Broadway Aug 09 Apr.10 500.000 " EVERETT 52
<br /> 75 Local Access-NM 9 47th Street Pedestrian Improvements Evergreen Way to Black Forest Lane Jan.11 Jun.12 500,000 " EVERETT 53
<br /> 76 Local Access-NM 10 Pigeon Creek No 1/BNSF Crossing Port of Everett Public Access Walkway to Pigeon Crk Rd Jan.10 Jul 11 Apr.12 925,000 " EVERETT 54
<br /> 77 Local Access-NM 11 Grand Ave/N Marina Ped-Bike Connection Grand Ave to W Marine View Drive Jan 12 Jan.13 May 14 1,050,000 * EVERETT
<br /> 78 Local Access-NM 12 Shoreline Access Improvements Various locations Apr 12 Apr 13 2,400,000 • EVERETT
<br /> 79 Local Access-NM 13 Snohomish River Bike and Ped Bridge E Manne View Drive to Smith Island Nov.01 Apr 12 9,000,000 " EVERETT 55
<br /> 80 Local Access-NM 14 Pigeon Creek Road No 1 Improvements Mukilteo Blvd to BNSF R/W Apr 12 Apr 14 1,000,000 " EVERETT 56
<br /> 81 Local Access-NM 15 Lowell Snohomish River Rd.Bike/Ped Connection Rotary Park to city limits May.11 Aug 12 Sep 13 1,500,000 " EVERETT 57
<br /> 82 Local Access-NM 16 Everett Non-Motorized Projects"" Various locations May 09 Aug 10 Sep 11 760,000 " EVERETT
<br /> 83 Local Access-NM 17 Riverfront District Bike/Ped Paths Various locations in Riverfront District Jul.09 Jul 11 500,000 " EVERETT
<br /> 84 Local Access-NM 18 Interurban Trail Bike/Ped Path Improvements Various locations on Interurban Trail Jul 10 Jul 11 500,000 " EVERETT
<br /> ""Candidate non-motorized improvements include Norton Avenue,Olympic Drive,Smith Avenue,Wall Street, 54,015,000
<br /> Lowell River Road,36th Street,Sharon Drive,Friday Avenue,Lowell Road-Lenora Street,90th Street SW,
<br /> 93rd Street SW,Dorn Avenue-92nd Street SE,7th Avenue SE,3rd Avenue SE,Dakota Way,Hollowdale Place,Cady Road,
<br /> Fleming Street,75th Street,100th Street SW,and Shore Avenue/Edgewater Beach and various shoreline public access projects
<br /> *A portion or all of the funding for this project has not yet been committed. NOTE Projects shown to bold type were not included in the 2009-2014 Six-year TIP.
<br /> Local Access Codes SAF=Safety, PR/M=Preservation and Maintenance, STR=Street construction, SIG=Traffic Signal Improvement,
<br /> NEI=Neighborhood Projects, LS=Landscaping Project, NM=Non-Motonzed Improvement
<br />
|