My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1212 CALIFORNIA ST RECOVERY CAFE EVERETT 2022-01-25
>
Address Records
>
CALIFORNIA ST
>
1212
>
RECOVERY CAFE EVERETT
>
1212 CALIFORNIA ST RECOVERY CAFE EVERETT 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 9:32:06 AM
Creation date
8/18/2021 1:23:07 PM
Metadata
Fields
Template:
Address Document
Street Name
CALIFORNIA ST
Street Number
1212
Tenant Name
RECOVERY CAFE EVERETT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT RECOVERY CAFE <br />2804 GRAND AVE <br />PLAN CHECK #: 131809-011 <br />11 /27/18 <br />The tenant space will be improved to accommodate a non-profit <br />organization that will, hopefully, improve the quality of life and give <br />direction for many of the homeless. It will provide care and direction from a <br />dedicated staff. The basic requirement is to be drug free for 24 hours and <br />participate in the Cafe activities. A simple hot meal consisting of a soup or <br />stew, a salad, some bread and a desert will be offered. Each individual will <br />be required to attend daily recovery meetings, job training classes, and <br />personal guidance. Classes for art, writing, exercise and other disciplines <br />will be offered. <br />Currently the space is being demolished as all "improvements" were done <br />with total disregard of the building codes, and an entirely new tenant <br />improvement plan is necessary. The alterations to the space will comply <br />with the Work Area Method, Level 2 Alterations of the IEBC. The current <br />occupancy is A-2 and the improvements will meet the criteria of Chapter 8 <br />of IEBC. Approximately 3,400 sq. ft. are classified as A-2, 2,200 sq. ft. will <br />be B occupancy and the rest of the space are the bathrooms, hallways <br />and storage rooms. <br />The building is a 2 story and basement heavy timber Type 111 B, and the <br />Cafe will occupy a portion of the basement. It is a fully sprinklered <br />building. A one hour floor separation will be installed between the <br />basement and the ground floor. The exits will be illuminated with battery <br />powered back ups, panic hardware and directional and braille signs. The <br />current floor is concrete that has a slope, some holes and a new leveling <br />slab will be installed to even the floor. Applicable stairs, ramps and <br />handrails will be installed to conform to current codes. Partitions will be <br />2x4 studs with 5/8" drywall both sides, and the ceiling will be 5/8" type X <br />drywall in the main areas and suspended in others as indicated on the <br />plans. The kitchen equipment will be simple. There will be no deep frying <br />or grease laden food that will require special equipment or ventilation. <br />Proper ventilation will be provided for the stove and the bathrooms. All <br />bathrooms, doors and exits will be provided with approved ADA fixtures <br />and hardware. Lighting will be either fluorescent or LED. No structural <br />work will be done to the space. <br />John Hadley <br />(323) 462-5874 <br />johnhadleyjr@gmail.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.