My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1212 CALIFORNIA ST RECOVERY CAFE EVERETT 2022-01-25
>
Address Records
>
CALIFORNIA ST
>
1212
>
RECOVERY CAFE EVERETT
>
1212 CALIFORNIA ST RECOVERY CAFE EVERETT 2022-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 9:32:06 AM
Creation date
8/18/2021 1:23:07 PM
Metadata
Fields
Template:
Address Document
Street Name
CALIFORNIA ST
Street Number
1212
Tenant Name
RECOVERY CAFE EVERETT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. John Hadley <br />EMA Investments, LLC <br />Plan Check Number: B1809-011, First Review <br />December 12, 2018 <br />Architectural <br />General: <br />1. No additional comment. <br />2. No additional comment. <br />3. No additional comment. <br />4. No additional comment. <br />Fire Protection: <br />5. This comment has not been completely addressed. The original comment stated that the <br />floor above and interior walls around the proposed project area shall have a minimum 1- <br />hour rated construction. See IBC Section 107.2.1 and Table 508.4. The following <br />comments shall be addressed: <br />a. The Ceiling Plan on Sheet 2-of-2 includes a note specifying 5/8-inch Type X GWB on the <br />floor framing and references the list assembly per GA File No. 5420. This assembly <br />requires a minimum floor sheathing thickness of approximately 1.5 inches thick. The <br />plan states a sheathing thickness of only 0.75 inches. The horizontal assembly shall be <br />revised. A detail for the assembly shall be provided. See IBC Section 711.2.4.1. <br />b. The Ceiling Plan on Sheet 2-of-2 specifies a 1-hour fire rated acoustic ceiling system. A <br />detail for the assembly shall be provided. The detail shall include a listed assembly <br />reference. See IBC Section 711.2.4.1. <br />c. The horizontal membrane systems have penetrations for lighting. Penetrations for <br />electrical, mechanical, and plumbing are also presumed to be required. Details for listed <br />systems shall be provided in the construction drawings for each type of penetration. <br />See IBC Section 714.4. <br />d. Details shall be provided for the 1-hour rated walls. The detail shall include listed <br />assembly references. See IBC Section 707.3.9. <br />e. Continuing with the previous comment, existing walls form part of the 1-hour enclosure <br />for the proposed project area. Details demonstrating that the walls provide the required <br />fire protection shall be included. Walls not provided the required protection shall be <br />modified. <br />f. The rated walls systems have penetrations for electrical service. Penetrations for <br />mechanical and plumbing are also presumed to be required. Details for listed systems <br />shall be provided in the construction drawings for each type of penetration. See IBC <br />Sections 714.3.1 and 714.3.2. <br />Egress: <br />6. No additional comment. <br />3200 Cedar Street 425.257.8800 everettpw@everettwa.gov <br />Everett, WA 98201 425.257.8882 fax everettwa.gov <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.