Laserfiche WebLink
• <br />CITY OF EVERETT <br />Permit Services <br />March 11, 2021 <br />Mr. Rich Boyd <br />Cesco NW Acquisition LLC <br />20830 International Blvd <br />Seatac, WA 98198 <br />Email Address: rich@cescoequipment.com <br />RE: Owner: Laundry Genius <br />Job Address: 7807 Evergreen Way <br />Plan Check Number: B2101-005, First Building Review <br />Dear Mr. Boyd, <br />'V <br />rr= V <br />D be;; -A <br />MAR 9 a 701 <br />CITY OF EVEREfifi <br />Permit 8erviEe§ <br />The proposed project has been reviewed for compliance with the provisions of the building codes <br />adopted and amended by the state of Washington and the city of Everett. The comments below <br />must be addressed before a permit can be issued. These comments address building issues only. <br />Additional revisions or additions may be required by other departments including Public Works, <br />Planning, and Fire. <br />Code citations provided in the following comments reference the 2015 International Building Code <br />(IBC), the 2015 International Existing Building Code (IEBC), the 2015 International Property <br />Maintenance Code (IPMC), the 2015 International Fire Code (IFC), the 2015 International <br />Mechanical Code (IMC), and the 2015 International Energy Conservation (IECC), and the 2015 <br />Washington State Energy Code (WSEC). The current IBC referenced standard for accessible design <br />is the 2009 "Accessible and Usable Buildings and Facilities" (ICC/ANSI Al17.1). Federal ADA, FHA, <br />and HUD regulations and standards, including the Fair Housing Accessibility Guidelines, may be <br />more restrictive. References to other design standards include the current edition. <br />In order for the processing of your application to continue, the following documentation shall be <br />submitted to the Building Division for review: <br />a. Itemized letter addressing the comments provided below. <br />b. Two complete sets of revised construction drawings. <br />c. Two copies of supplemental structural calculations. <br />Submittal documents shall contain sufficient information and detail to review the proposed project <br />for compliance with the adopted codes. Upon submittal of the revised documents, your application <br />will be given priority and plan reviews will recommence. <br />Page 1 of 3 <br />