Laserfiche WebLink
See attached parking plan showing 24 parking spaces in Parking Area A, and one ADA parking space on <br />/ the property <br />-✓ 6. Street trees are required in the landscape/furniture zone along 331 street. A minimum of 4 trees are <br />required. <br />See attached landscape plans showing the added street trees <br />Public Works Comments <br />7. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding is <br />not practical due to weather or seasonal restraints, the ground must be covered with mulch as directed <br />Jby the City Engineer. <br />See notes on plans <br />8. General stormwater notes regarding the detention system as currently designed: <br />• Do not use steel CMP pipe for the detention system. CMP must be aluminum, or used one of the <br />Jother approved pipe materials listed in the City of Everett Standard drawing #418 <br />See notes on sheet C3.2 <br />• The minimum size of the connecting pipe between the detention pipe and the upstream and <br />Jdownstream structures is 48" <br />Revised pipe to be 48" diameter <br />• Provide details for the detention pip and flow control manhole with restrictor assembly <br />J See attached details <br />• The riser is described as 8" riser in the stormwater site plan, but the model inputs show a 24" <br />riser was used in the calculations. Update the site plan anddesign to match the modeling <br />calculations. <br />See detail5JC3.2 <br />• Access to the detention facility shall be provided for maintenance by vactor truck <br />J See attached communication from Brian Doolan saying the design meets the requirements for <br />vactor truck access. <br />9. An RPBA is required on the domestic service from premise on this site, and shall be located in an above- <br />ground hot -box if located outside of the building, or can be located in the sprinkler riser room <br />RPSA is located in the Basement Mechanical Room 005. Noted on sheet C2.0 <br />10. A DCDA is required on the fire service, and shall be located in vault outside of the building if the <br />connections from the main to the building is greater than 70ft, or located in the sprinkler riser room if <br />within 70' of the connection to the main. <br />DCDA shown on sheet C2.0 <br />11. A DCVA is required on the irrigation service and shall be located in an underground vault downstream of <br />Jthe meter. <br />DCVA shown on sheet C2.0 <br />12. The existing water main on Lombard Ave is a 12" cast iron main from 1956. The landscape plans show <br />planters and trees over or in close proximity to the 12" cast iron main. These raised planter bed <br />structures will not be allowed in the vicinity of the main unless the development team chooses to <br />relocate the 12" water main to the West on Lombard Ave. <br />Landscape plans now show the planter boxes removed. <br />13. The side sewer shall connect to the sanitary sewer main at a manhole if 20 units or more served by the <br />side sewer. Verify the side sewer size is adequate for the number of units being served by adding <br />plumbing calculations per the 2015 UPC to the sewer plans. <br />.���."_.. <br />f�lµ <br />Page 2 of 5 <br />