My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 LOMBARD AVE COMPASS HEALTH SUPPORTIVE HOUSING 2022-02-18
>
Address Records
>
LOMBARD AVE
>
3301
>
COMPASS HEALTH SUPPORTIVE HOUSING
>
3301 LOMBARD AVE COMPASS HEALTH SUPPORTIVE HOUSING 2022-02-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 3:43:15 PM
Creation date
8/19/2021 9:39:07 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
3301
Tenant Name
COMPASS HEALTH SUPPORTIVE HOUSING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER SITE PLAN <br />COMPASS HEALTH SUPPORTIVE HOUSING <br />NOVEMBER 7, 2019 , <br />PAGE 1 <br />PROJECT OVERVIEW <br />This Stormwater Site Plan has been prepared for the Compass Health Supportive Housing <br />project located to the southeast of the intersection of Lombard Avenue and 33rd Street and <br />west of the alley in Everett, Washington, see Figure 1: Vicinity Map. The site is part of the <br />larger Compass Health property in the area and currently contains a single family building <br />located along 33rd Street at the alley with a detached garage behind it. The project is to <br />construct a multistory building consisting of 82 living units over common areas. The proposed <br />building will cover most of the site. See Figure 3: Developed Conditions. <br />Project Totals: <br />New Impervious: 10,930 sf <br />Replaced Impervious: 2,096 sf <br />METHODOLOGY <br />As the site is in the combined sewer area of Everett, the drainage design for the project has <br />been prepared based on the requirements of Public Works Policy #2-11 Storm water Control in <br />the Combined Sewer Area which references the 2010 City of Everett Stormwater Management <br />Manual. The design is based on the following parameters: <br />• The site is has less than 35% existing impervious. <br />• The project will result in 5,000 sf of more of impervious surface. <br />Therefore the project will need to meet Minimum Requirements 1-9 the new hard surfaces and <br />converted pervious areas. <br />WWHM2012, as provided by DOE, has been used for sizing of the proposed stormwater <br />facilities for the site. <br />P:\Work\Proiects\2017\17-125 Environmental Works\CE\DOCS\Final SSP 17-125.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.