Laserfiche WebLink
August 29, 2019 <br />Mr. Jeff Davis <br />G-4971 <br />Page 7 <br />concentrated flows can lead to increased soil erosion and rutting. Final site grades should direct <br />surface water away from the building. <br />Subsurface Drainage <br />We recommend that footing drains should be installed alongside perimeter foundation and <br />basement walls. The drains should consist of a four inch minimum diameter, perforated, rigid <br />PVC drain pipe laid at the bottom of the footing or wall with the perforations facing downward. <br />The drain line should be bedded on, surrounded by, and covered with a washed rock or gravel. <br />The drain rock and pipe also should be wrapped with a layer of durable non -woven geotextile <br />fabric. <br />The footing drain lines should be sloped at sufficient gradient to generate flow and should be <br />tight -lined to an appropriate stormwater discharge location or collection sump system. The <br />subsurface drainage lines should not be connected to roof downspout or other surface drainage <br />lines. A schematic illustration of these recommendations is shown in Plate 3 — Typical Footing <br />Drain. <br />LIMITATIONS <br />This geotechnical report has been prepared for the specific application to this site for the <br />exclusive use of Mr. Jeff Davis and his authorized representatives or agents. Any other use of <br />this report is solely at the user's own risk. We recommend that this report be included in its <br />entirety in the project contract documents for reference during construction. <br />Our findings and recommendations stated herein are based on field observations, our experience <br />with similar projects, and our professional judgment. The recommendations presented in this <br />Ietter are our professional opinion derived in a manner consistent with the level of care and skill <br />ordinarily exercised by other members of the profession currently practicing under similar <br />conditions in this area and within the project schedule and budget constraints. No warranty is <br />expressed or implied. In the event that soil conditions are found to differ from those discussed in <br />this report, GEO Group Northwest should be notified and the relevant recommendations in this <br />report should be re-evaluated. <br />GEO Group Northwest, Inc. <br />