Laserfiche WebLink
August 29, 2019 G-4971 <br />Mr. Jeff Davis Page 8 <br />CLOSING <br />We appreciate the opportunity to provide you with geotechnical engineering services for this <br />project. Please do not hesitate to contact us if you have any questions regarding this report. <br />Sincerely, <br />GEO Group Northwest, Inc. <br />J <br />Bryce Frisher, E.I.T. <br />Staff Geotechnical Engineer <br />William Chang, P.E. <br />Principal Engineer <br />Plates and Attachment: <br />Plate I — Site Location Map <br />Plate 2 — Site Plan <br />Plate 3 — Typical Footing Drain <br />Attachment 1 -- Boring Logs <br />aNm Cy <br />�p WASy�,Lti(i <br />r <br />20114 _< <br />GEO Group Northwest, Inc. <br />