My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SW Geotech Report 2022-10-25
>
Address Records
>
75TH ST SW
>
1802
>
Geotech Report
>
1802 75TH ST SW Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:52:47 PM
Creation date
8/20/2021 7:32:09 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1802
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Converse Consultants NW <br />t <br />j June 12, 1991 <br />Snohomish County PUD No, 1 <br />Post Office Box 1107 <br />Everett, Washington 98206 <br />Attention: Mr. N. James Simpson, P.E. <br />Project Leader <br />Subject: GEO TECHNICAL DESIGN REPORT <br />20th Avenue Substation Additions <br />1802 75th Street S.W. <br />Everett, Washington <br />Professional Services Contract No. 1791 <br />Geotechnical Engineering <br />and Applied Earth Sciences <br />Cascade Savings Financial Center <br />2828 Colby Avenue <br />Suite 407 <br />Everett; Washington,98201 <br />(266) 339-5192 TEL <br />91-35211-01 <br />This report presents the results of our geotechnical exploration for renova- <br />tions to the existing 20th Avenue Substation in Everett, Washington. The site <br />is located at 1802 75th Street S.W. We received written authorization to <br />proceed with our study on May 9, 1991. <br />PROJECT DESCRIPTION <br />The proposed project consists of adding., in 1991, a new control building, a <br />28 MVA power transformer, a slab for a future 115 kV circuit breaker, and <br />associated equipment and bus support structures. The locations of the new <br />structures are shown on the Site and Exploration Plan, Figure 1.- The <br />estimated foundation loads (per foundation) will be as follows: <br />A Wholly Owned Subsidiary of <br />The Converse Professional Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.