My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SW Geotech Report 2022-10-25
>
Address Records
>
75TH ST SW
>
1802
>
Geotech Report
>
1802 75TH ST SW Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:52:47 PM
Creation date
8/20/2021 7:32:09 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1802
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />Structure <br />Vertical..... <br />lbs. <br />ontal _ <br />lbs. <br />O.T. Moment <br />ft=:lbs� <br />Circuit Breaker -(future) <br />15,000 <br />10,000 <br />81,000 <br />Metal Control Building <br />500 psf <br />3,000 <br />18,000 <br />Bus Support <br />800 <br />1,900 <br />28,200 <br />Circuit Switcher <br />6,000 <br />1,700 <br />14,000 <br />Transformer <br />135,300 <br />30,000 <br />160,000 <br />12 kV Disconnect Switch <br />1,500 <br />21000 <br />26,800 <br />Metalclad Switchgear <br />20,600 <br />5,300 <br />32,000 <br />PROJECT SCOPE <br />The purpose of this study was to provide geotechnical design recommendations <br />for site preparation and foundation support of the proposed substation <br />equipment as outlined in our contract with the Snohomish County Public <br />Utilities District No. 1 - Professional Services Contract No. 1791, "Geotech- <br />nical Engineering Services for 20th Avenue Substation". Specifically our <br />scope of work included: <br />1. Supervision, observation, and logging of two 15.5 foot borings, and <br />obtaining representative soil samples. <br />2. Laboratory testing to determine relevant soil properties. <br />3. Engineering analyses. to evaluate suitable foundation alternatives, <br />anticipated foundation settlement and geotechnical design parameters. <br />4. Preparation of this written report summarizing field and laboratory <br />test results and recommendations regarding: <br />• suitable foundation types, <br />_0 all owable_verticai..and lateral._ bearing... pressures.,.. _....... <br />allowable Tateral bearing pressures for drilled foundations, <br />estimated foundation settlements, <br />foundation subgrade preparation, <br />suitability of on -site soils for use as fill or foundation bacicfill, <br />Converse Consultants NW <br />
The URL can be used to link to this page
Your browser does not support the video tag.