Laserfiche WebLink
Proposal for Geotechnical Engineering Services <br />Proposed Bank: 1515 132nd Street Southeast, Everett, Washington <br />March 15, 2019 <br />Plate 2: View , from <br />southeast corner of <br />the site looking site to <br />the north. <br />The site currently developed with a convenience store/restaurant, carwash, and fueling <br />station island. The carwash is located on the west half of the site and the convenience <br />store/restaurant are located in the central portion of the site. The fueling station island is <br />located in the east half of the site, see Plate 2, above. We understand it is planned to <br />demolish the fueling station island, decommission and backfill the underground fuel <br />storage tanks, and construct a new bank building in the east portion of the site. The <br />proposed layout is shown in Figure 2. <br />The bank building will be one-story in height and will be constructed at or near existing <br />site grades. The proposed building will be surrounded by asphalt paved parking and drive <br />areas. <br />The conclusions and recommendations in this report are based on our understanding of the <br />proposed development, which is in turn based on the project information provided. If the <br />above project description is incorrect, or the project information changes, we should be <br />consulted to review the recommendations contained in this study and make modifications, <br />if needed. In any case PanGEO should be retained to provide a review of the final design <br />to confirm that our geotechnical recommendations have been correctly interpreted and <br />adequately implemented in the construction documents. <br />19-049 1515 132nd St SE Page 2 PanGEO, Inc. <br />