My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3120 HEWITT AVE ALLIED CONSTRUCTION 2018-01-02 MF Import
>
Address Records
>
HEWITT AVE
>
3120
>
ALLIED CONSTRUCTION
>
3120 HEWITT AVE ALLIED CONSTRUCTION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:25:38 AM
Creation date
8/25/2021 8:08:04 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
3120
Tenant Name
ALLIED CONSTRUCTION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request Information <br />Request No 00110641 <br />Recorded By HMP <br />Billing Code <br />Customer Information <br />Service Request <br />Date 611912012 Time 14:25 <br />MALE, MICHAEL P. <br />Customer Name ALLIED CONSTRUCTION (SCOTT BJE <br />Address 392T COLBY AVE <br />Apartment No <br />Phone No (425 ) <br />E-Mail Address <br />Problem Information <br />Address 3120 <br />From Cross Street <br />Initiated From INTER <br />City <br />259.6057 Ext <br />Street HEWITT AVE <br />INTERNAL <br />Page 1 <br />7/13/2012 14:34 <br />Status CL <br />Customer id <br />Zip <br />Second Phone ( ) Ext <br />To Cross Street <br />City Subdivision <br />Problem Details REPLACE CONCRETE IN SIDEWALK AFTER WATER MAIN BREAK. <br />Problem STREET <br />Sub Problem SDWK <br />Down Date <br />Assignment Information <br />Assigned To HMP <br />Responded Date 611912012 <br />Left Date <br />Work Order No. 20050387 <br />SIDEWALK REPLACEMENT, ALLIED CONSTRUCTION CURRENTLY IN THE PROCESS OF REPLACING <br />SIDEWALK, WILL OFER TO REPLACE WITH CITY PROCESS AND CHARGE 112 PRICE PER ROY <br />HARRIS, MADE AND DELIVERED ESTIMATE, DIG OUT DAMAGED SECTIONS, FORMED, POURED 6 <br />YARDS CONCRETE 486 SQ FT 6-25-12, POURED S YARDS CONCRETE 405 SQ FT 6-27.12, <br />POURED 5 YARDS CONCRETE 405 SO FT N6 LF CURB 7.2.12, POURED 4112 YARDS <br />CONCRETE 364 SQ FT + 28 LF CURB 7.5.12, POURED 4112 YARDS CONCRETE 364 SO FT <br />24 LF CURB 7.6.12, POURED 4112 YARDS CONCRETE 364 SO FT 20 LF CURB 7-10-12, <br />POURED 4112 YARDS CONCRETE 364 SQ FT * 20 LF CURB 7-11.12, DEFORMED, BILLED <br />FOR 5112 YARD CONCRETE @ $87.75 PER YARD - $482.63 <br />STREETS <br />SIDEWALKS <br />Down Time <br />Action Taken <br />20120837 <br />HALE, MICHAEL P. <br />Responded Time <br />Left Time <br />Completed By: BOB BREKHUS, DENNIS B. Date: 711312012 <br />Logged By HMP HALE, MICHAEL P. <br />
The URL can be used to link to this page
Your browser does not support the video tag.