My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3120 HEWITT AVE ALLIED CONSTRUCTION 2018-01-02 MF Import
>
Address Records
>
HEWITT AVE
>
3120
>
ALLIED CONSTRUCTION
>
3120 HEWITT AVE ALLIED CONSTRUCTION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 10:25:38 AM
Creation date
8/25/2021 8:08:04 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
3120
Tenant Name
ALLIED CONSTRUCTION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sidewalk COST ESTIMATE SHEET <br />OL Public Works Department <br />Streets Division <br />3200 Cedar Street Everett WA 98201 <br />425-257-8821 <br />Fax 425-257-8882 <br />Date 3une 21, 2012 <br />Work Order # <br />Service Order # <br />Contact Person ----Telephone # <br />1 <br />. • • • •Ave- <br />T 3120 ud.11l _ C <br />® The following estimate is based upon the Street Division work group providing all labor and equipment. <br />Itemized Cost Estimate: <br />Labor & Benefits u <br />Material 'Comm : C 1/2 Yards A S87 79 Per lard <br />Equipment Rental 0 <br />Surface Restoration 0 <br />Sales Tax 0 <br />TOTAL 1 SJU12.63 <br />❑ Once the work is complete and I am billed I would like to set up monthly payment arrangements. <br />Prepared by: Mike Hale 42(5-257-BS35 Date Estimate Prepared: June 21- 2012 <br />Accepted by: 4: Representing:_�r <br />ature) <br />Cc: Dave Davis <br />Mark Sadler, P.E. <br />C,D• ,"U"d S«It0nU4iJ.\D"kt VC09T ESTDIATE 9HUT1An <br />
The URL can be used to link to this page
Your browser does not support the video tag.