Laserfiche WebLink
VM7'r <br />tMIMIC WORKS <br />December 30, 2011 <br />Thomas Chapel <br />Hutteball & Oremus Architects <br />tchapel@hoarch.com <br />RE: Owner: <br />Job Address: <br />Plan Check No: <br />Dear Mr. Chapel: <br />Allied Construction Assoc. <br />3120 Hewitt Ave <br />B1112-030 <br />In response to your application for a construction permit, your plans have been examined and <br />you are advised that the issuance of a permit is being withheld for the reasons listed below. <br />These comments address building issues only. Additional revisions, or additions, may he <br />required by other departments (such as Utilities, Planning or Fire). All references refer to the <br />2009 International Building Code, as amended by the State of Washington and adopted by the <br />City of Everett and the Washington State Energy Code, 2009 Edition, unless stated otherwise. <br />In order for the processing of your application to continue, it will be necessary :o <br />provide the Building Division with two sets of construction document revisions <br />reflecting the corrections requested. <br />The submitted mezzanine framing plan appears to be preliminary and incomplete. Also, <br />the plans should include the requirement for posting a storage toad limit in the <br />mezzanine in accordance with IBC 106.1. <br />If you have any questions, please call me at 425-257-7264. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure <br />that the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />l <br />Steve Miller <br />Associate Engineer <br />S.lkcollwkmdk+)81112 030 (3120 Hevvitt Ave) <br />ENGINEERING / PUBLIC SERVICES DIVISION • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />