Laserfiche WebLink
EXHIBIT B <br /> JOA OPERATING PLAN <br /> 1. PURPOSE <br /> This Plan establishes the terms and conditions under which Everett and the Participants shall <br /> operate their facilities, how flow changes at the point of delivery and Transmission Line <br /> operations shall be coordinated,and the conditions under which Everett meters the flow from <br /> Everett's Transmission Line at Marysville's point of delivery. <br /> 2. RESPONSIBILITIES OF THE CITY OF MARYSVILLE AND THE PUD <br /> A. Marysville shall maintain and repair all its Facilities starting at the point of delivery from <br /> Everett's Water Transmission Line No. 3 downstream of Everett's valve and meter. <br /> B. Marysville and the PUD shall provide Everett's operations contact advance oral or written <br /> notice of any proposed flow change that will result in a flow change (increase or decrease)as <br /> follows: <br /> 1) For flow changes less than 2 million gallons per day(MGD), no notification is <br /> necessary. <br /> 2) For flow changes equal to or greater than 2 MGD,at least one (1) hour <br /> notice, if not previously scheduled. <br /> 3. RESPONSIBILITIES OF THE CITY OF EVERETT <br /> A. Everett shall notify Marysville's and the PUD's Operations Contact, as listed in Section 6 of <br /> this Plan,at least 24-hours prior to any significant operational changes, construction or <br /> shutdown of key Everett facilities that could impact operations of Marysville and the PUD except <br /> for an emergency shutdown.Significant operational changes shall include but not be limited to: <br /> 1) Closure of valves on Everett's Transmission Line No.3 <br /> 2) Removal from service of either of Everett's clearwells located at Everett's Water <br /> Filtration Plant. <br /> B. Everett shall immediately notify Marysville's and the PUD's Operations Contact whenever it <br /> experiences or initiates an operational change outside the normal operating parameters of <br /> Everett's supply system or Everett's Water Transmission Line No.3. <br /> C. Everett shall own, maintain, and operate a meter including arranging and paying for <br /> calibration and or maintenance by the manufacturer or other acceptable service provider. <br /> D. Everett shall respond to Marysville's and the PUD's flow change notifications by managing <br /> flows on Everett's Water Transmission Line No. 3 in a manner that is consistent with the <br /> "Everett and 1OA Participants Water Supply Contract". <br /> 4.SHUTDOWNS <br /> A. For any planned shutdowns that impact Marysville and the PUD, Everett shall: <br />