My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marysville, PUD, Tulalip Tribes 8/16/2021
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Marysville, PUD, Tulalip Tribes 8/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:11 AM
Creation date
8/27/2021 10:40:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marysville, PUD, Tulalip Tribes
Approval Date
8/16/2021
Council Approval Date
8/4/2021
End Date
12/31/2050
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
JOA Water Supply Contract
Tracking Number
0003028
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1)Communicate with Marysville's and the PUD's Operations Contact listed in Section 6 <br /> about plans that may impact Everett's Water Transmission Line No.3 at least four <br /> months in advance to allow for coordination of planned shutdowns. <br /> 2) Provide written and verbal notice to Marysville's and the PUD's Operations Contact <br /> listed in Section 6 at least 30 calendar days prior to the shutdown. <br /> 3)Strive to avoid planned shutdowns on Fridays through Sundays,and during the period <br /> from May 15 to September 15. <br /> B. Everett shall immediately inform Marysville's and the PUD's Operations Contact if an <br /> emergency shutdown of Everett's Water Transmission Line No. 3 is necessary. <br /> C. Data Sharing <br /> A.As Everett,Marysville and the PUD mutually agree, each party shall provide the other party <br /> their system's digital communications, if requested,as described below: <br /> Status of flow,storage, pumping and power supply. <br /> 5.EMERGENCIES <br /> A. Everett shall immediately notify Marysville's and the PUD's Operations Contact listed in <br /> section 6 whenever it experiences or initiates an operational change outside the normal <br /> operating parameters of Everett's supply system or Everett's Water Transmission Line No.3. <br /> Everett shall inform Marysville's and the PUD's operational contact if it believes that an <br /> emergency shutdown is necessary, including any closure of the isolation valve on Everett's <br /> Water Transmission Line No. 3. <br /> B. Marysville and the PUD shall be responsible for modifying or shutting down its operations <br /> during a shutdown emergency as defined in Section 5.A. above. <br /> C.Whenever Marysville or the PUD believes an emergency shutdown of its operations is <br /> necessary,their operational contact shall immediately inform Everett's Operations Contact of <br /> the pending emergency shutdown. <br /> D. Marysville and the PUD shall be responsible for contacting Everett's Operations Contact and <br /> coordinating the re-start of its operations following any emergency shutdown. <br /> E. Marysville or the PUD shall be responsible for any damage to Everett's Water Transmission <br /> Line No. 3 caused by their negligent operation of facilities by Marysville or the PUD. Everett shall <br /> be responsible for any damage to the Marysville or the PUD Facilities caused by the negligent <br /> operation of Everett's water supply system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.