Laserfiche WebLink
Chaplain Gap Timber Sale <br /> 4-7 SHAPING CUT AND FILL SLOPE:Excavation and embankment slopes shall be constructed to a uniform <br /> line and left rough for easier revegetation. <br /> 4-8 CURVE WIDENING:The minimum widening placed on the inside of curves is: <br /> • 6 feet for curves of 50 to 79 feet radius. <br /> • 4 feet for curves of 80 to 100 feet radius. <br /> 4-9 EMBANKMENT WIDENING:The minimum embankment widening is: <br /> • 2 feet for embankment heights at centerline of 2 to 6 feet. <br /> • 4 feet for embankment heights at centerline of greater than 6 feet. <br /> Embankment widening shall be applied equally to both sides of the road to achieve the required width. <br /> 4-12 FULL BENCH CONSTRUCTION:Where side slopes exceed 50%full bench construction shall be utilized <br /> for the entire subgrade width except as construction staked or designed. <br /> 4-21 TURNOUTS: Turnouts shall be intervisible with maximum of 1,000 feet between turnouts unless shown <br /> otherwise on drawings. Locations shall be adjusted to fit the final subgrade alignment and sight distances. <br /> Turnout locations shall be subject to written approval by the Contract Administrator.Minimum dimensions <br /> are shown on the TYPICAL SECTION SHEET. <br /> 4-25 DITCH CONSTRUCTION AND RECONSTRUCTION: The Purchaser shall construct ditches into the <br /> subgrade as specified on the TYPICAL SECTION SHEET.Excavated slopes shall be consistent with Clause <br /> 4-5 CUT SLOPE RATIO.Ditches shall be constructed concurrently with construction of the subgrade. <br /> 4-28 DITCH DRAINAGE:Ditches shall drain to cross-drain culverts and ditchouts. <br /> 4-35 WASTE MATERIAL DEFINITION:Waste material is defined as all dirt,rock,mud,or related material that <br /> is extraneous or unsuitable for construction material. Waste material,as used in Section 4 EXCAVATION, <br /> is not organic debris. <br /> 4-36 DISPOSAL OF WASTE MATERIAL:Waste material may be sidecast on side slopes up to 50%if the waste <br /> material is compacted and free of organic debris. On side slopes greater than 50%, all excavation shall be <br /> end hauled or pushed to designated embankment sites and waste areas.All end haul material shall be placed <br /> in a specific location in the South Pit specified by the Contract Administrator. <br /> 4-38 PROHIBITED WASTE DISPOSAL AREAS:Waste material shall not be deposited in the following areas, <br /> except as otherwise specified in this plan: <br /> • Within 30 feet of a cross drain culvert. <br /> • Within 30 feet of a live stream or wetland. <br /> • In locations that interfere with the construction of the road prism. <br /> • In locations that impede drainage. <br /> • Against standing timber. <br /> • Outside the clearing limits. <br /> 4-55 ROAD SHAPING: The road subgrade and surface shall be shaped as shown on the TYPICAL SECTION <br /> SHEET.The subgrade and surface shape shall ensure runoff in an even,un-concentrated manner,and shall <br /> be uniform,firm,and rut-free. <br />