My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sierra Pacific Industries 8/16/2020
>
Contracts
>
6 Years Then Destroy
>
2023
>
Sierra Pacific Industries 8/16/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 12:00:10 PM
Creation date
8/27/2021 11:56:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sierra Pacific Industries
Approval Date
8/16/2020
Council Approval Date
8/4/2021
End Date
9/30/2023
Department
Public Works
Department Project Manager
Anna Thelen
Subject / Project Title
Chaplain Gap Timber Sale
Tracking Number
0003030
Total Compensation
$5,088,424.00
Contract Type
Agreement
Contract Subtype
Purchase
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chaplain Gap Timber Sale <br /> 10-22 PLASTIC BAND:Plastic coupling and end bands shall meet the AASHTO specification designated for the <br /> culvert.Only fittings supplied or recommended by the culvert manufacturer shall be used. <br /> 10-23 GAUGE AND CORRUGATION:Unless otherwise stated in the engineer's design,metal culverts shall <br /> conform to the following specifications for gauge and corrugation as a function of diameter. <br /> Diameter Gauge Corrugation <br /> 18" 16(0.064") 2 2/3"x <br /> 24"to 48" 14(0.079") 3 2/3"x'/2" <br /> 54"to 96" 14(0.079") 3"x 1" <br /> SECTION 11 SPECIAL NOTES <br /> FOREST ACCESS ROAD MAINTENANCE SPECIFICATIONS <br /> CUTS AND FILLS: <br /> • Maintain slope lines to a stable gradient compatible with the construction materials.Remove slides from <br /> ditches and the roadway.Repair fill-failures,in accordance with Clause 4-6 EMBANKMENT SLOPE <br /> RATIO,with selected material or material approved by the Contract Administrator.Remove overhanging <br /> material from the top of cut slopes. <br /> • Waste material from slides or other sources shall be placed and compacted in stable locations identified in <br /> the road plan or approved by the Contract Administrator,so that sediment will not deliver to any streams or <br /> wetlands. <br /> • Slide material and debris shall not be mixed into the road surface materials,unless approved by the <br /> Contract Administrator. <br /> SURFACE: <br /> • Grade and shape the road surface,turnouts,and shoulders to the original shape on the TYPICAL SECTION <br /> SHEET.Inslope or outslope as directed to provide a smooth,rut-free traveled surface and maintain surface <br /> water runoff in an even,unconcentrated manner. <br /> • Blading shall not undercut the backslope or cut into geotextile fabric on the road. <br /> • If required by the Contract Administrator,water shall be applied as necessary to control dust and retain fine <br /> surface rock. <br /> • Surface material shall not be bladed off the roadway.Replace surface material when lost or worn away,or <br /> as directed by the Contract Administrator. <br /> • Remove shoulder berms,created by grading,to facilitate drainage,except as marked or directed by the <br /> Contract Administrator. <br /> • For roads with geotextile fabric:spread surface aggregate to fill in soft spots and wheel ruts(barrel spread) <br /> to prevent damage to the geotextile fabric. <br /> DRAINAGE: <br /> • Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. <br /> • Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. <br /> • Maintain headwalls to the road shoulder level with material that will resist erosion. <br /> • Maintain energy dissipators at culvert outlets with non-erodible material or rock. <br /> • Keep ditches,culverts,and other drainage structures clear of obstructions and functioning as intended. <br />
The URL can be used to link to this page
Your browser does not support the video tag.