Laserfiche WebLink
Chaplain Gap Timber Sale <br /> • Inspect and clean culverts at least monthly,with additional inspections during storms and periods of high <br /> runoff.This shall be done even during periods of inactivity. <br /> PREVENTATIVE MAINTENANCE: <br /> • Perform preventative maintenance work to safeguard against storm damage,such as blading to ensure <br /> correct runoff,ditch and culvert cleaning,and waterbar maintenance. <br /> TERMINATION OF USE OR END OF SEASON: <br /> • At the conclusion of logging operations,ensure all conditions of these specifications have been met. <br /> DEBRIS: <br /> • Remove fallen timber,limbs,and stumps from the slopes,roadway,ditchlines,and culvert inlets. <br /> DESIGNATED HAUL ROUTES: <br /> • Log haul shall occur according to the table below for each unit unless written permission is granted by the <br /> Contract Administrator: <br /> o Unit 1:E-1000 to Monroe Camp Road <br /> o Units 2,5,6,7,8:Lost Lake Mainline to Woods Creek Road <br /> o Units 3,4:C-1000 through the Allen Gate to Lake Chaplain Road <br /> o Units 9, 10:T-1000 to Woods Creek Road <br /> DEBRIS: <br /> • Remove fallen timber,limbs,and stumps from the slopes,roadway,ditchlines,and culvert inlets. <br />