My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2306 RAINIER AVE 2021-09-08
>
Address Records
>
RAINIER AVE
>
2306
>
2306 RAINIER AVE 2021-09-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2021 10:27:47 AM
Creation date
8/27/2021 1:52:57 PM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
2306
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/9/2020 Page <br /> City of Everett <br /> 6:49:13AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. CW1908-001 Site Address 2306 RAINIER AVE <br /> Applied 8/22/2019 Applicant Lot <br /> Approved 11/1/2019 Owner SNITKO MICHAEL Block <br /> Issued 11/1/2019 Contractor TYLER'S CONSTRUCTION INC Tract <br /> Parent Permit No. W1907-009 Description INSTALL NEW FIXTURES,NEW RAILING,PORCHES <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> FIRE 01-ROUGH FFI eTRAKiT Inspection 11/14/2019 10:39 PM Michael Snitko <br /> IN Request <br /> Contact Name:Michael Snitko <br /> Site Address:2306 RAINIER AVE <br /> Phone:3603031919 <br /> e-Mail:michael.snitco74@gmail.com <br /> (Canceled-eTRAKiT-11/14/2019 <br /> 10:41:40 PM) <br /> *NO INSPECTION PTEC eTRAKiT Inspection 12/12/2019 6:34 PM Michael Snitko <br /> CURRENTLY Request Please call before arrive 360-303-1919 <br /> Contact Name:Michael Snitko <br /> Site Address:2306 RAINIER AVE <br /> Phone:3603031919 <br /> e-Mail:michael.snitco74@gmail.com <br /> (Canceled-eTRAKiT-12/12/2019 6:34:20 <br /> PM) <br /> 11/5/2019 AM 11/5/2019 BLDG TMB CORRECTION MICHAEL WILL CALL TUE MORNING <br /> 01-CONSULTATIO TO SET UP CONSULTATION TIME <br /> (11/5/2019 4:06 PM TMB) <br /> Remove wall and ceiling finishes as <br /> necessary to expose electrical,plumbing, <br /> and mechanical elements for inspection. <br /> Recall for roughin inspections when this <br /> has been accomplished. <br /> 11/15/2019 11/15/2019 GAS 01-ROUGH IN SDP CORRECTION (11/15/2019 2:58 PM SDP) <br /> Isolate the appliances from the gas piping <br /> and test the gas pipe for leaks.Call for an <br /> inspection of the pressure test. <br /> 11/15/2019 11/15/2019 MECH 04-ROUGH SDP CORRECTION see notes and 11/14/2019 10:41 PM Michael Snitko <br /> IN attachments <br /> Contact Name:Michael Snitko <br /> Site Address:2306 RAINIER AVE <br /> Phone:3603031919 <br /> e-Mail:michael.snitco74@gmail.com <br /> (11/15/2019 2:56 PM SDP) <br /> Have the mechanical contractor prepare a <br /> written evaluation report,the template for <br /> this is copied into the attachments. <br /> OR <br /> Expose all of the duct work and venting for <br /> the mechanical system. <br /> INSPl2 CR VsY T M <br />
The URL can be used to link to this page
Your browser does not support the video tag.