My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1525 75TH ST SW CASCADE COFFEE 2021-12-28
>
Address Records
>
75TH ST SW
>
1525
>
CASCADE COFFEE
>
1525 75TH ST SW CASCADE COFFEE 2021-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 3:11:41 PM
Creation date
9/15/2021 3:40:00 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1525
Tenant Name
CASCADE COFFEE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. STATEMENT OF SPECIAL INSPECTION <br />BC <br />SI <br />SO <br />LIRE <br />1705.3 <br />I <br />NBE <br />CONCRETE CONSTRUCTION (SEE TABLE 1705.3) <br />1705.6 <br />I <br />MR <br />SOILS (SEE TABLE 1705.6) <br />SI =SPECIAL INSPECTION <br />SO STRUCTURAL OBSERVATION <br />=ITEM IS REWIRED <br />NIR =TTEM IS NOT REQUIRED <br />SPECIAL INSPECTIONS INDICATED ARE FOR STRUCTURAL ELEMENTS ONLY. SEE MECH AND ELEC <br />DRAWINGS FOR ADDITIONAL SPECIAL INSPECTIONS. <br />1.1 INSPECT10NITESTING REQUIREMENTS <br />SEE DRAWINGS, SPECIFICATIONS, AND IBC SECTIONS 110. AND CHAPTER 17. <br />1.2 INSPECTIONS BY THE BUILDING OFFICIAL (IBC SECTION 110) <br />1.2.1 FOUNDATION INSPECTION SHALL BE MADE AFTER EXCAVATIONS ARE COMPLETE AND ANY <br />REQUIRED REINFORCING IS IN PLACE. ANY REQUIRED FORMS SHALL BE IN PLACE PRIOR TO <br />INSPECTION. <br />1.2.2 CONCRETE SLAB OR UNDER FLOOR INSPECTION SHALL BE MADE AFTER ALL UNDER SLAB <br />ACCESSORIES AND REINFORCEMENT ARE PLACED AND PRIOR TO CONCRETE SLAB PLACEMENT OR <br />FLOOR SHEATHING INSTALLATION. <br />1.2.3 FRAME INSPECTIONS SHALL BE MADE AFTER ALL FRAMING IS COMPLETE AND ALL PIPES, DUCTS, <br />ELECTRICAL, PLUMBING, ETC., ARE INSTALLED AND APPROVED PRIOR TO COVER <br />1.2.4 IN ADDITION TO THE INSPECTION SPECIFIED ABOVE, THE BUILDING OFFICIAL IS AUTHORIZED TO <br />MAKE OR REQUIRE OTHER INSPECTION OF ANY CONSTRUCTION WORK TO ASCERTAIN COMPLIANCE <br />WITH THE PROVISIONS OF THE IBC. <br />1.3 STRUCTURAL TESTS AND SPECIAL INSPECTIONS (IBC CHAPTER 17) <br />1.3.1 SEE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />1.3.2 STRUCTURAL TESTS AND SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE <br />REQUIREMENTS OF CHAPTER 17 OF THE IBC AS WELL AS ANY ADDRIONAL REQUIREMENTS OF THE <br />BUILDING OFFICIAL OMISSION FROM THE LIST BELOW OF TESTING AND INSPECTION <br />REQUIREMENTS SHALL NOT RELIEVE THE CONTRACTOR FROM PROVIDING TESTING AND <br />INSPECTION REQUIRED BY THE SPECIFICATIONS, THE IBC AND THE BUILDING OFFICIAL, <br />1.3.3 TESTING AND SPECIAL INSPECTIONS SHALL BE COMPLETED IN ACCORDANCE WITH THE <br />REQUIREMENTS OF CHAPTER 17 OF THE IBC FOR THE ITEMS LISTED IN THIS SECTION. <br />1.5 SPECIAL INSPECTOR SHALL BE CURRENTLY WABO CERTIFIED AND UNDER THE SUPERVISION OF <br />REGISTERED PROFESSIONAL ENGINEER <br />1,5.1 THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE NTH THE <br />APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. <br />1.5.2 THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, <br />ENGINEER OF RECORD, AND OTHER DESIGNATED PERSONS. ALL DISCREPANCIES SHALL BE <br />BROUGHT TO THE IMMEDIATE ATTENTION OF THE GENERAL CONTRACTOR FOR CORRECTION. THEN, <br />IF NOT IN CONFORMANCE, TO THE PROPER DESIGN AUTHORITY AND BUILDING OFFICIAL <br />1.5.3 THE SPECIAL INSPECTOR SHALL SUBMIT A SEALED FINAL REPORT BY A REGISTERED <br />PROFESSIONAL ENGINEER STATING WHETHER THE WORK REQUIRING SPECIAL INSPECTION WAS IN <br />CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS AND THE APPLICABLE <br />WORKMANSHIP PROVISION OF THE IBC. <br />2A. REQUIRED VERIFICATION AND INSPECTION OF SOILS <br />IBC TABLE 1705.6 <br />VERIFICATION AND INSPECTION TASK <br />CONTINUOUS DURING <br />PERIODICALLY DURING <br />TASK LISTED <br />TASK LISTED <br />1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO <br />NIR <br />ACHIEVE THE DESIGN BEARING CAPACITY <br />2. VERIFY EXCAVATIONS ARE EXTEND TO PROPER DEPTH AND RAVE REACHED <br />NIR <br />V <br />PROPER MATERIAL <br />3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIAL <br />NIR <br />4. VERIFY USE OF PROPER MATERIALS, DENSITIES, AND LIFT THICKNESSES <br />V <br />NR <br />DURING PLACEMENT AND COMPACTION OF COMPACTED FILL <br />5. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE AND <br />N/ <br />VERIFY THAT SITE HAS BEEN PREPARED PROPERLY <br />2.1 SPECIAL INSPECTIONS FOR EXISTING SITE SOIL CONDITIONS, FILL PLACEMENT, AND LOADAEARING REQUIREMENTS PER IBC 1705.6. <br />2.1.1 THE APPROVED CONSTRUCTION DOCUMENTS PREPARED BY THE REGISTERED DESIGN PROFESSIONALS SEWN BE USED TO <br />DETERMINE COMPLIANCE <br />3. REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION <br />IBC TABLE 17OU <br />VERIFICATION AND INSPECTION <br />CONTINUOUS <br />PERIODIC <br />REFERENCED STANDARD' <br />IBC REFERENCE <br />1. INSPECTION OF REINFORCING STEEL, INCLUDING <br />ACI M8: 3.5, 7.1-7.7 <br />1910A <br />PRESTRESSING TENDONS, AND PLACEMENT <br />4. INSPECTION OF ANCHORS POST4NSTALLED IN <br />HARDENED CONCRETE MEMBERS' <br />A ADHESIVE ANCHORS INSTALLED IN <br />HORIZONTALLY OR UPWARDLY INCLINED <br />7 <br />NIR <br />AC1318:0.91.4 <br />ORIENTATIONS TO RESIST SUSTAINED TENSION <br />LOADS <br />B. MECHANICAL ANCHORS AND ADHESIVE <br />NIR <br />V <br />ACT 318: D.9.2 <br />ANCHORS NOT DEFINED IN 4A <br />5. VERIFYING THE USE OF REQUIRED DESIGN MIX <br />NIR <br />ACA318: <br />4, 5.25.4 <br />19041, 19101,CH. <br />1910.3 <br />6. AT THE TIME FRESH CONCRETE IS SAMPLED TO <br />ASTM C 172 <br />FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM <br />V <br />NfR <br />ASTM C 31 <br />1910.10 <br />SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE <br />ACT 318: 5.6, 5.8 <br />TEMPERATURE OF THE CONCRETE <br />7. INSPECTION OF CONCRETE AND SHOTCRETE <br />V <br />NIRACT <br />318: 5.9, 5.10 <br />1910.8,1910.7. <br />PLACEMENT FOR PROPER APPLICATION TECHNIQUES <br />1910.8 <br />8. INSPECTION FOR MAINTENANCE OF SPECIFIED CURING <br />NIR <br />V <br />AC1318:5.115.13 <br />1910.9 <br />TEMPERATURE AND TECHNIQUES <br />12. INSPECT FORMWORK FOR SHAPE, LOCATION AND <br />NIR <br />ACT 318: 6.1.1 <br />DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED <br />3.1. CONCRETE SPECIAL INSPECTION AND TESTING PER IBC TABLE 1705.3 INCLUDING: <br />3.11 CONTINUOUS SPECIAL INSPECTION OF CONCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES. <br />3.1.5 SPECIFIC REQUIREMENTS FOR INSPECTION OF ANCHORS INSTALLED IN HARDENED CONCRETE SHALL BE AS DESCRIBED IN <br />THE RESEARCH REPORT ISSUED BY AN APPROVED SOURCE (ICC, IAPMO, ETC.). <br />mmom <br />TACOMA SEATTLE <br />2215 North 308f Sheet, Sub 300, T-0. WA 95403 <br />253- I422 to <br />1200 SNh Avet ' Suits 1620, S-Ibri. WA 98101 <br />2082672425 Ta <br />Pro'ect T.e. <br />CASCADE COFFEE <br />NEW EXTERIOR <br />EQUIPMENT <br />Clienl <br />CASCADE COFFEE, INC. <br />1525 75th ST SW SUITE 100 <br />EVERETT. WA 98203 <br />Job No. <br />2150149.20 <br />Is... Set 8 Date. <br />PERMIT SET <br />MAYS 2J15 <br />B.SfAD <br />TONAL <br />IeU9: OF WWUFNIS <br />8 <br />Revisions. <br />Sheet Title <br />TESTING AND SPECIAL <br />INSPECTION NOTES <br />Desionee bv: Drawn by, Checked bn <br />AS DR SS <br />Sheet No <br />S0e2 <br />of Sheets <br />
The URL can be used to link to this page
Your browser does not support the video tag.