My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 100TH ST SE 2021-12-13
>
Address Records
>
100TH ST SE
>
1920
>
1920 100TH ST SE 2021-12-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 8:41:51 AM
Creation date
9/16/2021 9:12:15 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SE
Street Number
1920
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1 Revised July 2016 <br />Project Info <br />Project Title: SEA MAR EVERETT MEDICAL CLINIC <br />Date 6/18/2019 <br />Compliance <br />forms do not <br />Applicant Information. Provide contact information for individual who can <br />respond to inquiries about compliance form information provided <br />For Building Department Use <br />Company Name: SEA MAR COMMUNITY HEALTH CENTERS <br />require a <br />password to <br />Company Address: 1040 SOUTH HENDERSON, SEATTLE, WA, 98108 <br />use. <br />Instructional and <br />calculating cells <br />are write - <br />protected. <br />Applicant Name: JOSE O. BAZAN <br />Applicant Phone: 206.849.2860 <br />Applicant Email JOSEBAZAN@BAZANARCHITECTS.COM <br />Project Description <br />❑ New Building ❑ Addition Alteration <br />Q Plans Included <br />Include PROJ-SUM form (included in envelope forms workbook) <br />with lighting complliance forms. <br />Building Additions <br />Compliance Method <br />Interior lighting <br />Exterior lighting <br />Lighting systems in addition area comply with all applicable <br />provisions as a stand alone new construction project <br />❑ <br />❑ <br />Refer to Section C502.2.6 for additional <br />requirements. <br />Lighting systems in addition are combined with existing <br />building lighting systems to demonstrate compliance <br />El <br />❑ <br />Addition is combined with existing: <br />For interior lighting projects, include new + existing interior lighting fixture wattage in Proposed Lighting <br />Wattage table in LTG-INT-BLD or LTG-INT-SPACE form. <br />For exterior lighting projects, include new + existing exterior lighting fixture wattage in Proposed <br />Tradable and Proposed Non -Tradable Lighting Wattage tables in LTG-EXT form. <br />Interior and Exterior <br />Lighting Power <br />Interior lighting <br />Parking garage <br />Exterior lighting <br />50% or more of existing are replaced <br />❑ <br />❑ <br />Lighting Alterations <br />Select all Lighting Power and Lighting <br />Control elements that apply to the scope <br />Less than 50% of existing are replaced <br />❑ <br />❑ <br />❑ <br />of the retrofit project. If project includes a <br />combination of spaces where less than <br />50% of the existing fixtures are replaced <br />- - <br />Lamp and/or ballast replacement only — <br />existing total wattage not increased <br />--— — <br />❑ <br />-- <br />❑ <br />❑ <br />in some spaces, and 50% or more of the <br />fixtures are replaced in others, then <br />provide separate lighting power <br />compliance forms for the two retrofit <br />conditions. Spaces undergoing the same <br />type of retrofit may be combined into one <br />lighting power compliance form. <br />50% or more replaced - Total lighting power of new + existing -to -remain fixtures shall comply with total <br />LPA per Sections C405.4.2 and C405.5.2. Include new + existing -to -remain fixtures in Proposed <br />Lighting Wattage table in LTG-INT-BLD, LTG-INT-SPACE or LTG-EXT form. <br />Less than 50% replaced - Total lighting power of new + existing -to -remain fixtures shall not exceed the <br />total lighting power prior to alteration. Include new + existing -to -remain fixtures in the Proposed Lighting <br />Wattage table in LTG-INT-BLD, LTG-INT-SPACE or LTG-EXT form. <br />50% threshold applies to number of luminaires for interior spaces and parking garages, and total <br />Refer to Section C503.6 for additional <br />installed wattage for exterior luminaires. <br />requirements. <br />Lighting Controls <br />Interior lighting <br />Parking garage <br />Exterior lighting <br />All alteration lighting controls shall be <br />commissioned per C408.3. <br />New wiring installed to serve added <br />fixtures and/or fixtures relocated to new <br />❑ <br />❑ <br />circuit(s) <br />New or moved lighting panel <br />❑ <br />❑ <br />❑ <br />Interior space is reconfigured - <br />luminaires unchanged or relocated only <br />❑ <br />LL <br />5L <br />_ v` <br />New wiring or circuit - For interior lighting, provide required manual controls per C405.2.3, occupancy <br />sensor controls per C405.2.1, daylight responsive controls per C405.2.4 and application specific lighting <br />❑ No changes are being made to <br />the interior or exterior lighting <br />systems and existing space <br />controls per C405.2.5. For exterior lighting, provide required controls per C405.2.7. <br />New or moved panel - Provide all applicable lighting controls as noted for New Wiring and automatic <br />time switch controls per C405.2.2. <br />uses and configuration are not <br />Reconfigured interior space - Provide all required lighting controls that apply to a new interior space. <br />changed. <br />Application specific lighting control provisions per C405.2.5 do not apply to reconfigured spaces. <br />Change of Space Use <br />❑ Existing interior lighting systems in areas under -going a change in space use are upgraded to <br />comply with LPAs for the new space types per Tables C405.4.2(1) or C405.4.2(2). <br />Identify interior spaces requiring LPD upgrade to the current Code in Proposed Lighting Wattage table in <br />LTG-INT-BLD or L TG-INT-SPA CE form. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.