Laserfiche WebLink
2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1 Revised July 2016 <br />Project Title: SEA MAR EVERETT MEDICAL CLINIC <br />Date 6/18/2019 <br />Interior Lighting System <br />ALL NEW LIGHT FIXTURE SHALL BE LED TYPE. RESTROOMS AND OFFICE SPACE <br />Description <br />LIGHTING SHALL BE CONTROLLED WITH OCCUPANCY CONTROL SWITCH. REFER TO <br />WATTAGE SCHEDULE FOR ADDITIONAL INFORMATION ON SHEET AE2.01. <br />Interior Lighting Power <br />0 Building Area Method 0 Space -by -space Method <br />Allowance Method <br />Select method used in project. <br />Interior Lighting Controls <br />❑✓ All C405.2.1- C405.2.8 Controls C405.2 Exception 5 Luminaire Level <br />Lighting Control (LLLC) <br />❑ Additional Efficiency Package Option <br />C406.4 Enhanced digital lighting controls <br />To comply with C406.4, no less than 90% of the total installed interior lighting power shall comply with the <br />required controls per C406.4. <br />Dwelling Unit Interior <br />Permanently installed interior lighting fixtures in dwelling units comply with: Q <br />Lighting <br />O C405.2 thru C405.5 Commercial Lighting Controls and LPA <br />Q C406.3 High Efficacy Lighting <br />O <br />Exterior Lighting System <br />Description <br />Eto <br />