Laserfiche WebLink
• • <br /> MSD SUPPORT CENTER REPAIR SHOP <br /> UTILITY 12 MONTH PEAK DEMAND CALCULATION WORKSHEET <br /> MDB <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 12 Month Peak Demand (Month &Year) : November 2019 <br /> Phase to Phase Voltage (Volts) : 480 <br /> Phases (1=Single Phase, 3=Three Phase) : 3 <br /> Utility Peak Demand = 348.1 KW <br /> Power Factor / 0.90 (P.F.) <br /> Apparent Peak Demand = 386.78 KVA <br /> NEC 220.87(2)adjustment factor X 1.25 KVA <br /> Adjusted Peak Demand = 483.47 KVA <br /> Seasonal adjustment factor X 1.00 KVA <br /> Seasonal adjustment peak demand = 483.47 KVA <br /> Occupancy adjustment factor X 1.00 KVA <br /> Occupancy adjustment peak demand = 483.47 KVA <br /> Other adjustement factor(s) X 1.00 KVA <br /> Utility Peak Demand with Adjustments = 483.47 KVA <br /> New Calculated Demand Load Added Panel 1 PT2 + 3.76 KVA <br /> Panel 4PA2 + 11.96 KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 499.19 KVA <br /> CALCULATED DEMAND CURRENT : 600 AMPS <br />