Laserfiche WebLink
• I <br /> MSD SUPPORT CENTER REPAIR SHOP <br /> 30 DAY PEAK DEMAND CALCULATION WORKSHEET <br /> PANEL ''I PT2' <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 30-day demand study from : 7/22/2020 to 8/24/2020 <br /> Phase to Phase Voltage (Volts) : 208 <br /> Phases (1=Single Phase, 3=Three Phase) : 3 <br /> 30 Day Peak Demand On : 8/13/2020 = 35.15 Amps <br /> Apparent Peak Demand = 12.66 KVA <br /> NEC 220.87(2)adjustment factor X 1.25 KVA <br /> Adjusted Peak Demand = 15.83 KVA <br /> Seasonal adjustment factor X 1.00 KVA <br /> Seasonal adjustment peak demand = 15.83 KVA <br /> Occupancy adjustment factor X 1.00 KVA <br /> Occupancy adjustment peak demand = 15.83 KVA <br /> Other adjustement factor(s) X 1.00 KVA <br /> Measured Peak Demand with Adjustments = 15.83 KVA <br /> New Calculated Demand Load Added + 3.76 KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 19.59 KVA <br /> CALCULATED DEMAND CURRENT : 54 AMPS <br />