Laserfiche WebLink
• • <br /> MSD SUPPORT CENTER REPAIR SHOP <br /> 30 DAY PEAK DEMAND CALCULATION WORKSHEET <br /> PANEL '4P2' <br /> NEC 220.87 AND WAC 296-46B-900(3)(j) <br /> 30-day demand study from : 7/22/2020 to 8/24/2020 <br /> Phase to Phase Voltage(Volts) : 480 <br /> Phases (1=Single Phase, 3=Three Phase) : 3 <br /> 30 Day Peak Demand On : 7/27/2020 = 37.14 Amps <br /> Apparent Peak Demand = 30.88 KVA <br /> NEC 220.87(2)adjustment factor X 1.25 KVA <br /> Adjusted Peak Demand = 38.60 KVA <br /> Seasonal adjustment factor X 1.00 KVA <br /> Seasonal adjustment peak demand = 38.60 KVA <br /> Occupancy adjustment factor X 1.00 KVA <br /> Occupancy adjustment peak demand = 38.60 KVA <br /> Other adjustement factor(s) X 1.00 KVA <br /> Measured Peak Demand with Adjustments = 38.60 KVA <br /> New Calculated Demand Load Added CHARGER + 11.96 KVA <br /> Metered Demand Based <br /> CALCULATED DEMAND LOAD : 50.56 KVA <br /> CALCULATED DEMAND CURRENT : 61 AMPS <br />