Laserfiche WebLink
3/1/2021 https://waenergycodes.com/print_project_summaryform.php?k=Y29tYm9fdGZ2X3B0PWx0Z19zY29wZV9uZXdfaW50ZXJpb311NONwZF9jaGdfc3BhY2VfY29uZGI0aW9uaW5n,lnRmdj1sdG... <br /> LIGHTING COMPLIANCE SUMMARY ' ,"n 1 <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Administered by:©2021 NEEA,All rights reserved <br /> Project Title Harvey-Tenant Improvement-2018 WSEC For Building Department Use: I Date: Mar 02,2021 <br /> Project Address 6202 Industry Street&Associated Blvd <br /> Project&Applicant Everett,WA 98203 _ <br /> Information Applicant Name Randy Brown <br /> Applicant Phone 206-228-8000 <br /> Applicant Email Randy.Brown@synthesispllc.com <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Warehouse, Building Cond.Floor 1,546 <br /> Use Type Distribution Area <br /> Alteration New Project Cond.Floor 1,546 <br /> Change in Space Conditioning(Semi-heated converted to Fully Building or Alteration Area <br /> • <br /> General <br /> neral Project Types Conditioned) Addition Lighting Interior Lighting Floors Above Grade 1 <br /> Change in Occupancy(Group F,S or U converted to another Lighting Scope Compliance Method 1- <br /> commercial occupancy) Scope Compliance Method <br /> General <br /> Lighting Project Description Office lighting to include 2x4 LED fixtures,LED downlights and LED strip lighting <br /> Type <br /> Luminaire Replacement Scope Compliance Method <br /> Interior/Exterior LPA Calculation <br /> Lighting Compliance ScopeProject (Interior includes both interior&parking) Adjustment Compliance Verification <br /> and Method <br /> Change in Space Conditioning Interior Lighting Building area Reduced lighting power density option COMPLIES <br /> Additional Efficiency Reduced lighting power density credit Enhanced lighting controls credit <br /> Options Included <br /> ° i""` ''''' Harvey-Tenant Improvement-2018 WSEC °o :to Mar 02,2021 <br /> Lighting Power Calculation CHANGE IN SPACE CONDITIONING-INTERIOR LIGHTING 1" Compliance Verification COMPLIES <br /> Compliance Method Building area LPA Calculation Adjustment LPA x 0.8 <br /> Interior Lighting Power Allowance-Building Area <br /> Building Areas Gross Interior Area(SF) LPA(Watts/SF) Total Watts Allowed Total Proposed Watts Compliance Status by <br /> (SF x LPA x 0.8) By Building Area Building Arca <br /> Office 1,546 0.64 791 676 COMPLIES <br /> Proposed Lighting Power Density <br /> Watts per Total Watts <br /> New or Quantity of Fixtures,CLDs or Total Linear Watts per Linear Proposed <br /> Fixture Type/Application Fixture ID Building Area Existing-to-Remain Luminaires #F Fixture,CLD or Feet LF Foot(WpLF) #F x W For <br /> ( ) Luminaire(WpF) ( ) ( P ) ( P ) <br /> (LF x WpLF) <br /> Individual Fixtures <br /> Troffer 2x4 LED Recessed lighting Office New 13 40 520 <br /> Recessed downlight Recessed 6"LED Office New 4 12 48 <br /> 1111 <br /> Linear Fixtures <br /> LED strip 2'wall mounted LEI)strip lighting Oflicc New 2 54 108 <br /> Project Title Harvey-Tenant Improvement-2018 WSEC Date Mar 02,2021 <br /> Proposed Fixtures Details CHANGE IN SPACE CONDITIONING-INTERIOR LIGHTING <br /> I'ixture Type/Application Fixture ID Location in Documents Lamp'I'ype Building Area New or <br /> Existing-to-Remain <br /> Individual Fixtures <br /> https://waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3BOPWxOZ19zY29wZV9uZXdfaW50ZXJpb311NONwZF9jaGdfc3BhY2VfY29uZGI0aW9uaW5nJnRmdj1 sdGdfc2NvcGVf... 1:/2- <br />