My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4808 EVERGREEN WAY SUITE A & B THE KUSHERY 2021-09-22
>
Address Records
>
EVERGREEN WAY
>
4808
>
THE KUSHERY
>
4808 EVERGREEN WAY SUITE A & B THE KUSHERY 2021-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 3:06:14 PM
Creation date
9/22/2021 2:08:01 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
4808
Unit
SUITE A & B
Tenant Name
THE KUSHERY
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase I Environmental Site Assessment Page 19 August 28,2020 <br /> 4808 Evergreen Way,Everett,Washington RG1 Project No.2020-382-1 <br /> 15 QUALIFICATIONS <br /> 15.1 LOGAN D.CHINN,LG,PROJECT GEOLOGIST <br /> Education <br /> M.S. Earth and Space Sciences, University of Washington, 2013 <br /> B.S. Geological Sciences, California University Long Beach, 2010 <br /> Special Training, Licenses, and Certifications <br /> Washington State Licensed Geologist (License No. 19110582) <br /> Washington State Site Assessor (Certificate No. 8868032) <br /> 40-Hour Hazardous Waste Operations and Emergency Response (HAZWOPER) <br /> 24-hour Asbestos Hazard Emergency Response Act (AHERA) (Certification No. 169048) <br /> Amateur Radio Operator (FCC License No. KI60HC) <br /> Radiation and Nuclear Gauge Safety Training Class <br /> First-Aid/CPR/AED (Certification No. 8CC8319) <br /> Professional Experience <br /> Mr. Chinn is a project level geologist with more than eight years of academic research experience <br /> in the geological sciences. With a strong background in structural field geology, Mr. Chinn's <br /> experience includes extensive time performing his own research as well as contributing to <br /> ongoing studies with his geologic mapping, laboratory methods, and informed interpretation. <br /> Representative Project Experience <br /> As a staff field geologist, Mr. Chinn has been a contributor to many Phase I and II Environmental <br /> Site Assessments, has successfully executed many Asbestos Containing Material (ACM) surveys, <br /> infiltration testing, geotechnical monitoring of shoring and structural pile installations, <br /> extensive nuclear gauge testing, and has assisted with Dual Phase Extraction (DPE) pilot studies. <br /> Furthermore, Mr. Chinn has produced countless soil logs and samples for both environmental <br /> and geotechnical purposes, contributing to subsurface sampling events throughout the Pacific <br /> Northwest. Working alongside a variety of different drilling methods, Mr. Chinn is well-versed <br /> in field-screening techniques for volatile organic compounds (VOCs), including use of a gas <br /> analyzer equipped with a photo ionization detector (PID)to aid in informed sample selection. <br /> Mr. Chinn has also been utilized as an assistant driller, aiding in the use of a direct-push <br /> GeoProbe on environmental investigations. Additionally, Mr. Chinn is a certified UST Site <br /> Assessor, and has contributed to multiple UST remedial actions. <br /> 1 <br /> 1 �- <br /> RILEYGROUP <br />
The URL can be used to link to this page
Your browser does not support the video tag.