Laserfiche WebLink
Lighting Summary, ck,nt. LGT-SUM <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2,R3,R4 over 3 stories and all R1 Revised August 2016 <br /> Project Title: Wendy's Interior Dining RoomlToilet Room Tenant Improvement. (Date 8/6/2018 <br /> Interior Lighting System Interior Dining,Service Counter and Toilet room interior remodel. Install new floor tile,base, <br /> Description wall tile/GWB with Paint finish and new acoustical ceiling grid and tile with new LED lights. <br /> Also,project includes removing the old tables and chairs and installing new due to wear and <br /> tear over the years <br /> Interior Lighting Power ❑ Building Area Method E Space-by-space Method <br /> Allowance Method Select method used in project. <br /> Interior Lighting Controls ❑� All C405.2.1-C405.2.8 Controls ❑C405.2 Exception 5 Luminaire Level <br /> Lighting Control(LLLC) <br /> Additional Efficiency Package Option <br /> C406.4 Enhanced digital lighting controls <br /> To comply with C406.4,no less than 90%of the total installed interior lighting power shall comply with the <br /> required controls per C406.4. <br /> Dwelling Unit Interior Permanently installed interior lighting fixtures in dwelling units comply with: QQ <br /> Lighting 0 C405.2 thru C405.5 Commercial Lighting Controls and LPA <br /> Q C406.3 High Efficacy Lighting <br /> 0 <br /> Exterior Lighting System No Exterior Alterations to Lighting-Existing to Remain <br /> Description <br />