|
Section 4:
<br />That the City of Everett hereby retains an easement to construct, reconstruct, operate,
<br />maintain, repair, and replace all utilities under, over, and across said vacated street and alley, as
<br />legally described within Section 1 of this ordinance.
<br />The City of Everett further retains the right to grant to public and private utilities the right to
<br />construct, reconstruct, operate, maintain, repair, and replace existing or proposed utility lines
<br />including, but not limited to, cable, telephone, gas, and electrical under, over, and across the
<br />property above.
<br />The City further retains the right of access across adjoining properties for the purposes set forth
<br />herein.
<br />Section 5:
<br />That at all times activities conducted in and around the herein described easement shall be
<br />conducted so as not to interfere with, obstruct, or endanger the usefulness of any
<br />improvements or other facilities now or hereafter maintained upon the easement or in any way
<br />interfere with, obstruct, or endanger the City's use of the easement.
<br />Section 6:
<br />Prior to any construction, work, or other activity being conducted in or on the herein easement
<br />by anyone other than the City, a notification and plans for the same shall be submitted in
<br />writing to the City and no such construction, work, or activity shall be commenced without the
<br />City's prior written agreement that the proposed construction, work, or activity will not
<br />interfere with the City's easement described herein; PROVIDED, HOWEVER, any changes or
<br />revisions in the plans shall also be subject to the City's prior agreement. The City's review of
<br />the plans under this easement shall not be deemed to impose any duty or obligation on the City
<br />to determine the adequacy or sufficiency of the plans and designs nor whether said
<br />construction, work, or activity is in conformance with other applicable plans, codes, and
<br />regulations. Further, agreement by the City to such construction, work, or activity shall not in
<br />any manner be considered as imposing any obligation, duty, or liability upon the City as to the
<br />safety or propriety of such construction, work, or activity.
<br />Section 7:
<br />The City is hereby authorized to cut, trim, and remove any and all brush, trees, other vegetation
<br />or debris upon the herein easement and the City has the right of access for such purposes. The
<br />City is also authorized to cut, trim, and remove any and all brush, trees, other vegetation, and
<br />3
<br />
|