My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2022-01-19
>
Address Records
>
AIRPORT RD
>
8925
>
MUKILTEO SCHOOL DISTRICT
>
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 8:57:31 AM
Creation date
10/13/2021 1:21:36 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
8925
Tenant Name
MUKILTEO SCHOOL DISTRICT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER SITE PLAN <br />FEBRUARY 26, 2018 <br />MUKILTEO SCHOOL DISTRICT- TRANSPORTATION <br />PAGE 5 <br />Concrete and grout: <br />• Process water and slurry resulting from concrete work will be prevented from <br />entering the waters of the state by implementing concrete handling measures (BMP <br />C151). <br />1. Concrete truck chutes, pumps, and internals shall be washed out only <br />into formed areas awaiting installation of concrete or asphalt. <br />2. Unused concrete remaining in the truck and pump shall be returned to <br />the originating batch plant for recycling. <br />3. Hand tools including, but not limited to, screeds, shovels, rakes, floats, <br />and trowels shall be washed off only into formed areas awaiting installation of <br />concrete or asphalt. <br />When no formed areas are available, washwater and leftover product shall be contained <br />in a lined container. Contained concrete shall be disposed of in a manner that does not <br />violate groundwater or surface water quality standards. <br />Sanitary wastewater: <br />• Portable sanitation facilities will be firmly secured, regularly maintained, and <br />emptied when necessary. <br />• Solid waste will be stored in secure, clearly marked containers. <br />Other: <br />Other BMPs will be administered as necessary to address any additional pollutant <br />sources on site. <br />Element #10: Control De -Watering <br />No dewatering is expected as no excavation to the water table is anticipated. Any dewatering <br />will be directed to an on -site sump or pre -manufactured settling system to allow for settlement <br />of suspended solids. <br />Element #11: Maintain BMPs <br />Notes for the maintenance of erosion control facilities will be included on the construction <br />plans. <br />Element #12: Manage the Project <br />The project will be subject to seasonal work limitations, site inspection and monitoring as <br />required by the City of Everett. Erosion control monitoring and supervision will be managed by <br />the contractor. With less than 1 acre of exposed surface, a Certified Erosion and Sedimentation <br />Control Lead is not required. <br />Element #13: Protect Low Impact Development BMPs <br />There are no LID BMPs to protect. <br />P:\Work\Projects\2012\12-185 Mukilteo SWE\DOCS\Transportation Facility Drainage 12-185.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.