My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2022-01-19
>
Address Records
>
AIRPORT RD
>
8925
>
MUKILTEO SCHOOL DISTRICT
>
8925 AIRPORT RD MUKILTEO SCHOOL DISTRICT 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 8:57:31 AM
Creation date
10/13/2021 1:21:36 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
8925
Tenant Name
MUKILTEO SCHOOL DISTRICT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER SITE PLAN <br />FEBRUARY 26, 2018 <br />MUKILTEO SCHOOL DISTRICT - TRANSPORTATION <br />2. PROJECT DESCRIPTION <br />See description in MR1. <br />PAGE 6 <br />3. EXISTING SITE CONDITIONS <br />The transportation facility consists of a single building surrounded by parking and access. The <br />bus parking area is to the south of the building and covers approximately half of the site. The <br />area to be paved is currently brush and some trees with slopes to the south of approximately 5- <br />10 percent. The paved areas are above the native grade by about 5 feet. <br />4. ADJACENT AREAS <br />The site is south of Kasch Road, east of the Skills Center, west of a wetland corridor with the <br />Community Transit bus facility further to the east and north of commercial buildings. <br />S. CRITICAL AREAS <br />There are existing wetlands on the site. Wetland Resources, Inc has documented them in a <br />separate report. <br />6. SOILS <br />See previous soil description in MR1. <br />7. POTENTIAL EROSION PROBLEM AREAS <br />There are no potential erosion problem areas. <br />8. CONSTRUCTION SEQUENCE & PHASING <br />There will be no phasing. <br />9. CONSTRUCTION SCHEDULE <br />A Construction Schedule is located on the plans. <br />10. FINANCIAL/OWNERSHIP RESPONSIBILITIES <br />Mukilteo School District is the project owner. <br />11. ENGINEERING CALCULATIONS <br />No erosion control engineering calculations have been prepared. <br />12. EROSION CONTROL SPECIALIST <br />With less than 1 acre of disturbance construction will not require a certified erosion control <br />specialist. Maintaining erosion control will be the responsibility of the contractor. <br />P:\Work\Prcjects\2012\12-185 Mukilteo SD\CE\DOCS\Transportation Facility Drainage 12-185.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.