Laserfiche WebLink
Firefox <br />about:blank <br />STEP 3. DETERMINE FLOW CONTROL REQUIREMENT <br />Does this project create greater than 200 square feet of net new impervious area (item E from <br />table above)? <br />x Yes No <br />If yes, then the project is not exempt and flow control is required. Complete entire <br />checklist. <br />If no, then the project is exempt from the flow control requirement. Skip the rest of <br />Step 3 and complete STEPS 4 and 5 of this spreadsheet. <br />Determination of `fee in -lieu of flow control' eligibility: <br />Is the project in the eligible sub -basin of the combined sewer area as depicted in Figure 6-10.1 <br />of the City of Everett Design and Construction Standards and Specifications? <br />?'Yes No <br />If no, then the fee option is not available for your project. Skip the fee calculation <br />below and complete the rest of the checklist. <br />If yes, will this project choose to take the fee option instead of designing and installing a <br />flow control facility? <br />�- - Yes No <br />If yes, then calculate fee using the table below and complete Steps 4 and 5 of this <br />checklist (Step 6 not required). <br />If no, skip the fee calculation below and complete the rest of the checklist. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Prgects in <br />the Combined Sewer Area-Apri12021 <br />�4 of 23 <br />6/8/2021, 10:18 AM <br />