Laserfiche WebLink
Firefox <br />about:blank <br />STEP 4..._._ O3 PL.ET IVIII_N1._ - M REC>rQlR— MENTS.____.._.____. <br />The more information provided in these subsections typically corresponds to faster review and permit <br />issuance times. Submitted checklists that lack the necessary information for review are considered <br />incomplete and will be returned unprocessed to the applicant. <br />Preparation of Stormwater Site Plan <br />The purpose ofthis task is to convey all relevant information about the proposed project to the City for review <br />to ensure the project is in compliance with the current City and State stormwater management standards. <br />This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br />significant and insignificant aspects of the project with regards to stormwater management <br />Task 1: Describe existing site conditions <br />,Provide description of existing site conditions: <br />The flat site has an existing 1,468 sf SFR on a 0.14 ac lot, The vegetation on -site is lawn <br />landscaping with some trees. <br />Describe existing structures (location, type): <br />The existing SFR is in good condition and is located on the front 2J3rds of the site. <br />Describe slopes on your site (flat, rolling, steep,Maw <br />%) <br />The site has flat slopes 1 to 5% and slopes from the front of the building to Baker Ave. <br />The rear of the iste slopes to the alley at 2 to 31'%. <br />Describe hard surfaces (roof, ground treatment): <br />The majority of the site has lawn and landscaping ground cover. The 1,468 sf roof <br />area for the existing SFR. <br />Describe vegetative surfaces (location, quantity ftl): <br />The existing site has 0,1 ac or, 4,356 st vegetative cover, <br />a <br />City of Everett Public Waks <br />Small Project Stormwater Site Plan Report for Projects in 6 <br />the Combined Sewer Area -April 2021 <br />5 of 23 <br />6/8/2021, 10:18 AM <br />