My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2318 BAKER AVE 2022-01-19
>
Address Records
>
BAKER AVE
>
2318
>
2318 BAKER AVE 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 9:31:25 AM
Creation date
10/14/2021 8:14:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Firefox <br />about:blank <br />Describe drainage flow paths (direction, location): <br />Runoff from the rear yard of 2318 Baker Ave drains to the alley flowing south to <br />24th ST to StNH 103.62 of combined sewer and drainage system, <br />Are there Critical Areas? What are they and where are they located relative to your project? <br />(Check with the Planning Division at planning(a)everettwa.v if you are unsure if the property is in <br />close proximity to a Critical Area.): <br />s <br />No Critical Areas on -site or near. <br />Task 2: Describe proposed project <br />'Describe your proposed project: <br />This site will construct a detached garage 20' x 24' 480 sf adjacent to the alley way, <br />How will your project change the existing condition?: <br />The site will increase the impervious surface area by 480 sf, <br />rr, <br />g Y <br />Describe roofs, patios, driveways, or structures added: <br />The garage will have 160 sf of asphalt driveway o the building. The roof area will be <br />600 sf of non pollution generating roof surface. <br />How will stormwater be managed in the final condition?: <br />�l <br />y. Downspouts will disperse runoff to the natural ground. <br />Describe how the project will affect existing drainage systems onsite or on adjacent properties <br />or both: <br />The runoff rate is 0.02 cfs over the pre -developed condition. Note less than 0.15 cfs <br />increase in the 100 yr storm event. <br />city of Jvewtl Pubfic Works <br />Small Pfqecl Sterrnwater Site Plan Report for Projects in 7 <br />the Combined Sewer Area -April 2021 <br />of 0 <br />6/8/2021, 10:18 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.