Laserfiche WebLink
Firefox <br />about:blank <br />Element 8. Control pollutants: <br />❑ BMP C IS is Concrete Handling <br />❑ BMP C 152: Sawcutting and Surfacing Pollution Prevention <br />❑ BMP C 153: Material Delivery, Storage, and Containment <br />❑ BMP C 154: Concrete Washout Area <br />❑ BMP C250: Concrete Stormwater Chemical Treatment <br />❑ BMP C251: Construction Stormwater Filtration <br />• BMP C252: High pH Neutralization Using CO2 <br />❑ BMP C253: pH Control for High pH Water <br />❑ OtherPertheSWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />Element 10. Control dewatering: <br />❑ BMP C236: VegetativeFiltration <br />❑ Other PertheSWMMWW: <br />VNot applicable to my proposed project <br />Explain: No dewatering ofthe site is needed. <br />Element 11. Maintain BMPs: <br />15B1,11P C I SO: Materials On Hand <br />❑ BMPC160:CertifiedErosion and SedimentControlLead <br />(CESCL not required on -site for < I acre). <br />❑ Other PertheSWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />Element 12. Manage the Project: <br />ISAMP C ISO: Materials On Hand <br />❑ BMPC 160: Certified Erosion and SedimentControl Lead <br />(CESCL not required on -site for sites <Iacre) <br />❑ BMP C 162: Scheduling <br />❑ Other Per theSWMMWW: <br />❑ Not applicable to my proposed project <br />Explain: <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer Area-Apd12021 <br />13 <br />6/8/2021, 10:18 AM <br />