Laserfiche WebLink
Firefox <br />about:blank <br />Element 13. Protect low impact development: <br />BMP C102: BuNerZones <br />❑ BMP C 103: High Visibility Plastic or Metal Fence <br />❑ BMP C200: Interceptor Dike and Swale <br />BMP C207: Check Dams <br />❑ BMP C208: Triangular Silt Dike (Geotextile Encased Check Dam) <br />❑ BMP C231: BrushBarrier <br />lfBMP C233 SiltFence <br />BMP C 234: Vegetated Strip <br />❑ Other Per the SWMMWW: _ <br />❑ Not applicable to my proposed project <br />Explain: <br />Task 3: Construction SWPPP drawings <br />Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br />Show on your TESC Plan all BMPs selected above to satisfy the 13 Elements on your <br />TESC Plan. <br />See City of Everett Public Works Standard Plan 103 -TESC Plan Example <br />e..ve...r..ettwa,goy/Do cu_.m....e..ntCe. nte...r/Vew/7040 <br />Note: Construction StormwaterPoltutionPrevention Plans (Construction S WPPPs) that <br />involve engineering calculations must also be prepared by or under the direction ofa <br />Washington State licensed professionalengineer. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer -Area -April 2021 <br />14 <br />13 of 23 <br />6/8/2021, 10:18 AM <br />