My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2318 BAKER AVE 2022-01-19
>
Address Records
>
BAKER AVE
>
2318
>
2318 BAKER AVE 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 9:31:25 AM
Creation date
10/14/2021 8:14:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Firefox <br />about:blank <br />Option 2A Infiltration Trench Design Worksheet <br />BMP T5.10A Roof Downspout Full Infiltration <br />Downspout full infiltration systems are trench or drywell designs intended for use in infiltrating runoff from <br />roof downspout drains. They are not designed to directly infiltrate runoff from pollutant generating <br />impervious surfaces. Projects that infiltrate runoff from pollutant generating surfaces must provide <br />treatment prior to infiltration. <br />Infiltration Trench <br />The minimum trench length is based upon the soil type in the location of the infiltration trench. The soils <br />reportwill provide the USDA Soi I Type. The table below provides them i nim urn, trench length per 1,000 <br />ft2 of contributing impervious area. Infiltration trenches shall be designed in accordance with the <br />SWMMWW. <br />Table 2A-Small Project Infiltration Trench Desiin <br />FFn F <br />"Coarse sand" (more than 50% of sand fraction remains on #4 sieve) 20 <br />40 <br />"Medium sand" (more than 50% of sand traction remains on 940 sieve) 30 <br />60 <br />Loamy sand <br />75 <br />150 <br />Sandy loam <br />125 <br />250 <br />Loam <br />190 <br />380 <br />Sift loam <br />275 <br />550 <br />Trench length required (ft) = Impervious area (ft2) "((minimum trench length) (ft)) <br />1000 (ft2) <br />M, :.Net new impervious area requiring mitigation (ft2): 404_ <br />• USDA Soil Type per soils report: Aideratoq"urbanland complex <br />■ Trench length required.,! <br />(Trench length cannot exceed 100 ft. 1f length exceeds 100 ft, multiple trenches will be required.) <br />• Number of trenches: 1 <br />• Length of each trench: 10 ft'< <br />The following setback and design requirements have been met: <br />I. The maximum length of the trench shall not exceed 100 feet from the inlet sump. <br />2, The minimum spacing between trench centerlines shall be 6 feet _ <br />3. Infiltration trenches should not be built on slopes steeper than 25% (4:1). A geotechnical analysis and <br />report may be required on slopes over 15%, or if the proposed trench is located within 200 feet of the <br />top of a slope steeper than 40%, or in a landslide hazard area. <br />City of Everett Public Works <br />Small Prryecl Stormweter Site Plan Report for Projecls in 17 <br />the Combined Sewer Arca-April 2021 <br />i 16 of 23 _1 <br />6/8/2021, 10:18 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.