My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2318 BAKER AVE 2022-01-19
>
Address Records
>
BAKER AVE
>
2318
>
2318 BAKER AVE 2022-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 9:31:25 AM
Creation date
10/14/2021 8:14:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Firefox <br />about:blank <br />Option 2B Rain Garden Design Worksheet <br />The top of the ponded surface area below the overflow shall be at least 13.5% of the net new impervious <br />surface area draining to the rain garden. Projects that have a greater contributing impervious area to <br />the BMP shall use the larger of the two areas, or as an alternative may have the BMP sized by an <br />Engineer using a continuous runoff model to meet the flow control requirements of Section 6.10 of the <br />DCSS. The table below provides design geometry based upon contributing impervious area. Refer tothe <br />Rain Garden Handbook for Western Washington: A Guide for Design, Installation, and Maintenance <br />(Hinman etal. 2013) for construction guidance. Bioretention shall be designed in accordance with <br />section 6.10 of the DCSS and the SWMMWW. Use the following criteria for design of the <br />bioretention pond. <br />The applicable Setback requirements in Section 4-4.1 (3) have been met, including: <br />• 50 feet setback from slopes greater than 15 percent and greater than 10 feet in height. <br />Minimum Side Slope = 3:1 <br />Minimum Infiltration Rate = 0.3 in/hr <br />Minimum depth of Biosoil = 12-inches <br />Ponding depth = 6-inches <br />Freeboard = 6-inches <br />Table 2B — Small Proiect Rain Garden Flow Control Des <br />200 to 400 <br />54 <br />19 <br />400to 600 <br />81 <br />36 <br />600 to 800 <br />108 <br />SS <br />800to 1000 <br />135 <br />74 <br />1000to 1200 <br />162 <br />9s <br />1200to 1400 <br />186 <br />110 <br />1400 to 1600 <br />218 <br />137 <br />1600to 1800 <br />243 <br />1s8 <br />1800to 2000 <br />270 <br />180 <br />gn Sizing <br />• Net new impervious area requiring mitigation (ft2):", <br />• Contributing impervious area to BMP: <br />■ Total contributing area including landscaped area (ft2): <br />Design Top of Ponded Surface Area (ft2) = 0.135*(contributing impervious area (ft2)) <br />ft2 <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer Area-April2021 <br />FM <br />C18of 23 <br />6/8/2021, 10:18 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.