Laserfiche WebLink
Your options are; <br />R-10 rigid insulation continuous on the interior with a framed wall with R-13 insulation in <br />the cavity or <br />a framed wall on the interior with R-21 in in the framing cavity. <br />The stairs in units B & C will need to be adjusted for the additional wall thickness required. <br />If you have any questions on the architectural & energy code review, please email or call me at <br />(425) 257-8976. <br />Upon submittal of the drawings, your application will be given priority and plan reviews will <br />recommence. All required submittals shall be sufficient detail and contain sufficient information to <br />ensure that the proposed structure will be constructed in compliance with all adopted codes. <br />Please prepare a response letter showing where each item in this correction <br />letter is addressed on the plan set. <br />Sincerely, <br />Jeff Heilman <br />Development Technician <br />City of Everett Public Works Department <br />3200 Cedar St, Everett, WA 98201 <br />Office: 425-257-8810 1 Direct: 425-257-8976 <br />Email: iheilman(Weverettwa.gv <br />PIvAKIc wogs <br />The Permit Services Counter is located on the 2nd Floor. <br />Hours of Operation: Monday -Friday 7:30am-12:00pm and 1:00pm-4:00pm. <br />All emails, and attachments, sent to and from City of Everett are Public <br />Records and may be subject to public disclosure pursuant to RCW 42.56. <br />CITY OF EVERETT . 3200 Cedar Street • Everett, WA 98201 9 (425) 257-8810 9 Fax (425) 257-8857 <br />