My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2118 KIRBY PL 2022-02-18
>
Address Records
>
KIRBY PL
>
2118
>
2118 KIRBY PL 2022-02-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 6:58:40 AM
Creation date
10/14/2021 1:41:07 PM
Metadata
Fields
Template:
Address Document
Street Name
KIRBY PL
Street Number
2118
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />https://everettwa.gov/DocumentCenter/View/24146/Permitting-procedures-during-temporar -- <br />office-closure-PDF <br />Email: everetteps@everettwa.gov <br />Since this letter was issued, additional work without permits have been discovered and needs to be <br />addressed as well. <br />Current review times are at 14 weeks and re -reviews are at about 7-8 weeks. We are willing to put <br />this project in the re -review line vs. the new submission line once we receive an electrical permit <br />application for the relocation of the electrical panel and re -wiring of the structure. The submitted <br />plans should also show all of the work that was done (that requires a permit) to include any new <br />plumbing (plumbing lines were relocated), the removal of the fireplace, the movement of interior <br />walls, etc. <br />The legality of the detached garage and vegetation removal are still in question - the owners should <br />contact the Planning Department to determine the legality of these issues. If the landscaping removal <br />or detached garage are not legal, these issues will also effect the timely issuance of permits. <br />We can reasonably ensure the review is completed within 7-8 weeks, however, incomplete scope on <br />the plans submitted and the legality of the garage and vegetation removal, would cause a significant <br />delay. <br />y Eileen Hinkley <br />Code Enforcement Supervisor I Permit Services <br />425.257.8563 1 Fax 425.257.8569 13200 Cedar Street, 2"d Floor, Everett, WA 98201 <br />EYERETT everettwa.gov/codeenforcement I Facebook I Twitter <br />Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br />Records Act. <br />
The URL can be used to link to this page
Your browser does not support the video tag.