Laserfiche WebLink
F 19-31440-2## <br />Attachment C <br />Budget <br />The Contractor shall report on its progress in implementing the Scope of Work on a quarterly basis. <br />The report shall include the type and number of materials acquired with grant funds, and the type and <br />number of materials so acquired which have been distributed to each of the counties within its ITT region. <br />The quarterly report will be submitted in Word format to the COMMERCE representative identified on this <br />Contracts Face Sheet, not later than the 151" day following the end of each calendar quarter of this <br />contract. <br />1 <br />