Laserfiche WebLink
City of Everett <br />Parking Access and Revenue Control System <br />Quality Control <br />All equipment will undergo manufacturing tests and quality assurance inspections to validate <br />compliance with functional specifications and technical requirements prior to the start of <br />installation. <br />Factory Acceptance Test (FAT) <br />Orbility will conduct a Factory Acceptance Test (FAT) to verify the functional performance of all <br />systems, subsystems, and components of the Automated Parking Management System and <br />ensure adherence to the functional specifications prior to turning equipment over to the City's <br />installation team. <br />Work Tasks <br />City of Everett Implementation <br />Automated Parking Management System <br />Task Name <br />Notice to Proceed <br />Duration <br />1 day <br />Contract Signature <br />1 day <br />Plan/Mobilize <br />3 days <br />Project Kickoff Meeting <br />1 day <br />Verification of Existing Site Condition <br />1 day <br />Site Mobilization <br />1 day <br />Plan/Mobilize Phase Complete <br />0 days <br />System Design Review <br />28 days <br />Develop <br />2 wks <br />Plan Submittal <br />2 days <br />Documentation Submittal <br />1 wk <br />Review <br />1 wk <br />Updates <br />1 wk <br />Design Review Complete <br />1 day <br />Order Site PARCS Equipment <br />70 days <br />Multipark Codex PARCS (procurement, shipping, receiving) <br />70 days <br />Pedestrian Readers <br />14 wks <br />POF (Pay -on -Foot) Stations <br />14 wks <br />Simplified Terminals <br />14 wks <br />Entry Terminal <br />14 wks <br />Exit Terminal <br />14 wks <br />Barrier Gates <br />8 wks <br />Spare Parts <br />14 wks <br />Server Infrastructure <br />10 wks <br />Development (site specific configuration) <br />30 days <br />Develop <br />4 wks <br />Review <br />1 wk <br />Updates <br />1 wk <br />Integration (third party hardware and/or apps) <br />30 days <br />orbility <br />Page 6 <br />