My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD 2023-01-30
>
Address Records
>
RIVERSIDE RD
>
405
>
405 RIVERSIDE RD 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 12:03:59 PM
Creation date
10/14/2021 5:14:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1.2 Pro osedsitedevelopment Construction v <br /> p <br /> of Description (example:Acti subdivisionities ): <br /> ILight Industrial and Commercial <br /> I Description of construction activities (example: site preparation, demolition, excavation): <br /> This project proposes the construction of a light industrial multi use buildings on a cleared lot in <br /> the Riverside Industrial District. Proposed improvements also include the installation of a storm <br /> I drainage system to serve the development. Phase 1 of the project previously built the water <br /> quality facitlities and the river outfall that the Phase 2 storm facilities will tie into. <br /> 1 Construction activities will include site preparation, TESC installation, excavation for utilities and <br /> foundations, grading, utility installation, asphalt paving, concrete pours, and landscaping. <br /> Description of site drainage including flow from and onto adjacent properties. Must be consistent <br /> with Site Map in Appendix A: <br /> IThe site is entirely vacant of existing structures and significant vegetation. The existing grade of <br /> the site is about 10' higher than the adjacent properties, as a result flow onto the site is <br /> negligible. Flow from the site will be discharged after treatment into the Snohomish River. <br /> Description of final stabilization (example: extent of revegetation, paving, landscaping): <br /> IIn final conditions the developed site will be fully stabilized with paving of access drives and <br /> onsite parking, onsite landscaping will be seeded and planted to comply with City of Everett <br /> I guidelines. Storm drainage is designed to convey the 100 year rainfall event and to treat runoff <br /> per the Snohomish county and the city of Everett drainage guidelines and will discharge into the <br /> Snohomish River. <br /> II <br /> Contaminated Site Information: <br /> I Proposed activities regarding contaminated soils or groundwater(example: on-site treatment <br /> system, authorized sanitary sewer discharge): <br /> A portion of the proposed stormwater outfall was installed below the Weyerhaeuser working <br /> I <br /> surface (further described in the Environmental Media Management Plan, prepared by Terra <br /> Associates, dated May 7, 2017) in remediation area 7-2A (RA7-2A). In the event that <br /> contaminated soils are found, the contaminated solids will be segregated and placed on plastic <br /> 1 sheeting and covered. Interceptor dikes will be provided at the base of the stockpile area. The <br /> contaminated solids will be routed offsite to a Waste Management facility for disposal. In the <br /> event that contaminated soils are found, contaminated dewatering water will be stored onsite <br /> Iand discharged to the nearest active sewer under permit. <br /> I <br /> I <br /> Page IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.