My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
405 RIVERSIDE RD 2023-01-30
>
Address Records
>
RIVERSIDE RD
>
405
>
405 RIVERSIDE RD 2023-01-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 12:03:59 PM
Creation date
10/14/2021 5:14:24 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 2 Construction Stormwater Best Management Practices (BMPs) <br /> Refer to the project's proposed TESC plans included in the Appendix A. Alternate City <br /> Iapproved BMPs shall be utilized in the event the BMP(s) listed below are deemed ineffective or <br /> inappropriate during construction to satisfy the requirements set forth in the General NEDES <br /> Permit (Appendix C). To avoid potential erosion and sediment control issues that may cause <br /> Iviolation(s) of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment <br /> Control Lead will promptly initiate the implementation of altemative BMPs after the first sign that <br /> I existing BMPs are ineffective or failing. The SWPPP is a living document reflecting current <br /> conditions and changes throughout the life of the project. These changes may be informal (i.e., <br /> hand-written notes and deletions). Update the SWPPP when the CESCL has noted a deficiency <br /> in BMPs or deviation from original design. <br /> 2.1 The 13 Elements <br /> 1 2.1.1 Element 1: Preserve Vegetation / Mark ClearingLimits <br /> 9 <br /> I <br /> To protect adjacent properties and to reduce the area of soil exposed to construction, the limits <br /> of construction will be clearly marked before land-disturbing activities begin. The BMPs relevant <br /> to marking the clearing limits that will be applied for this project include: <br /> Applicable BMPs: <br /> I • BMP C102: Buffer Zones <br /> • BMP C103: High Visibility Fence <br /> IInstallation Schedules: Start of project and replaced as needed and at start of wet season. <br /> Inspection and Maintenance plan: Responsible staff to make weekly site walks and inspection to <br /> Iidentify deficiencies in onsite BMPs and anticipate potential problems and remedies. <br /> Responsible Staff: Identified Certified Erosion and Sediment Control Lead in Section 3 of this <br /> ISWPPP. <br /> I <br /> I <br /> I <br /> I <br /> IPage 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.