2.1.5 Element 5: Stabilize Soils <br /> Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent <br /> erosion throughout the life of the project. <br /> I <br /> In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be <br /> temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, <br /> Iprotected with sediment trapping measures, and where possible, be located away from storm <br /> drain inlets, waterways, and drainage channels. <br /> IEarthwork quantities: 12,200 CY Cut/ 10,350 CY Fill <br /> West of the Cascade Mountains Crest <br /> I Season Dates Number of Days Soils Can <br /> Be Left Exposed <br /> During the Dry Season May 1 —September 30 7 days <br /> 111 During the Wet Season October 1 —April 30 2 days <br /> ISoils must be stabilized at the end of the shift before a holiday or weekend if needed based on <br /> the weather forecast. <br /> IAnticipated project dates: Start date: 03/18 End date: 03/19 <br /> Will you construct during the wet season? <br /> I ® Yes❑ No <br /> IApplicable BMPs: <br /> Element 5: Stabilize Soils: <br /> I • BMP C120: Temporary and Permanent Seeding <br /> • BMP C121: Mulching <br /> I • . BMP C123: Plastic Covering <br /> • BMP C130: Surface Roughening <br /> 1 • BMP C140: Dust Control <br /> • Early application of gravel base on areas to be paved <br /> Installation Schedules: Start of project and replaced as needed and at start of wet season. <br /> Inspection and Maintenance plan: Responsible staff to make weekly site walks and inspections <br /> to identify deficiencies in onsite BMPs and anticipate potential problems and remedies. <br /> Responsible Staff: Identified Certified Erosion and Sediment Control Lead in Section 3 of this <br /> SWPPP. <br /> I <br /> IPage 111 <br />