Laserfiche WebLink
I <br /> 2.1.6 Element 6: Protect Slopes <br /> IWill steep slopes be present at the site during construction? <br /> ❑ Yes N No <br /> ICut and fill slopes within the site will be designed, constructed, and protected in a manner that <br /> minimizes erosion. The BMPs to be used to protect slopes for this project are listed below. <br /> Applicable BMPs: <br /> • BMP C120: Temporary and Permanent Seeding <br /> • BMP C121: Mulching <br /> • BMP C123 Plastic Covering <br /> I • BMP C130: Surface Roughening <br /> Installation Schedules: Start of project and replaced as needed and at start of wet season. <br /> IInspection and Maintenance plan: Responsible staff to make weekly site walks and inspections <br /> to identify deficiencies in onsite BMPs and anticipate potential problems and remedies. <br /> IResponsible Staff: Identified Certified Erosion and Sediment Control Lead in Section 3 of this <br /> SWPPP. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> Page 112 <br />