Laserfiche WebLink
2.1.8 Element 8: Stabilize Channels and Outlets <br /> Provide stabilization, including armoring material, adequate to prevent erosion of outlets, <br /> adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all <br /> conveyance systems. <br /> Where site runoff is to be conveyed in channels or discharged to a stream or some other natural <br /> drainage point, efforts will be taken to prevent downstream erosion. The specific BMPs for <br /> Applicable BMPs: <br /> • Check Dams (BMP C207) <br /> • Outlet Protection (BMP C209) <br /> Installation Schedules: Start of project and replaced as needed and at start of wet season. <br /> Inspection and Maintenance plan: Responsible staff to make weekly site walks and inspections <br /> to identify deficiencies in onsite BMPs and anticipate potential problems and remedies. <br /> Responsible Staff: Identified Certified Erosion and Sediment Control Lead in Section 3 of this <br /> SW PPP. <br /> Page 114 <br />